Tuesday, 15 September 2015

Our Ref: 15223 / Office: Sunshine Coast
Council Ref: MCU15/0068



        NOOSA COUNCIL
        PO BOX 141
        TEWANTIN QLD 4565

        ATTENTION: Glen Conforti


Dear Glen

INFORMATION RESPONSE

DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE - MULTIPLE HOUSING
TYPE 2 DUPLEX

6 CRANK STREET, SUNSHINE BEACH
LOT 431 RP48112

Further to Council’s Information Request for the abovementioned proposal we now respond in full to
each of the items raised.

In support of the response we attach:
 Amended Proposal Plans prepared by Kidd + Co Designers
 Earthworks Retaining Plan prepared by SCG Consulting Engineers

Front Setback
The upper storey setback impacts on views from neighbouring properties.

1. Provide plans indicating a greater setback to the development. Please contact Council for
    discussion.

Response:
Refer Amended Proposal Plans which provide for a greater street setback to the development.

Garage Detail
It is not clear of NGL and finished surface levels at garage 1’s southern elevation.

2. Provide further detail on NGL and finished surface levels to the southern elevation detailing
    garage 1 including retaining walls and the like.

Response:
Refer Amended Proposal Plans which provide for further detail on both the southern and western
elevation on NGL and finished surface levels. Refer Earthworks Retaining Plan for retaining wall
details.
Log in to download the original file

Information Response.pdf · 324 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 1 page

Page 2

Street Presentation
There is considerable height from the driveway to the first floor unit which presents open and high to
the street.

3. Provide options which will address the presentation to the street.

Response:
Refer Amended Proposal Plans which provide for 4 x 45lt trees to the street frontage to provide
buffering and amenity benefit to the street presentation.

Earthworks
The proposed building will require earthworks including excavation to a depth of approximately 6m
near the southwest part of the site.

4. Provide a preliminary engineering/geotechnical assessment that includes:
        (a) A plan that indicates the cut and fill to be carried out on the site
        (b) Earth retaining methods during construction and proposed measures to ensure stability of
            adjacent properties and buildings.

Response:
Refer Earthworks Retaining Plan detailing the proposed earthworks and retaining methods.


The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
KHA DEVELOPMENT MANAGERS




Scott Sobey
DIRECTOR
Email: [email protected]

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.