Original source · versioned page text
Information Response
Attached to the e-mail MCU15/0068 - Response to Information Request.
Street Presentation
There is considerable height from the driveway to the first floor unit which presents open and high to
the street.
3. Provide options which will address the presentation to the street.
Response:
Refer Amended Proposal Plans which provide for 4 x 45lt trees to the street frontage to provide
buffering and amenity benefit to the street presentation.
Earthworks
The proposed building will require earthworks including excavation to a depth of approximately 6m
near the southwest part of the site.
4. Provide a preliminary engineering/geotechnical assessment that includes:
(a) A plan that indicates the cut and fill to be carried out on the site
(b) Earth retaining methods during construction and proposed measures to ensure stability of
adjacent properties and buildings.
Response:
Refer Earthworks Retaining Plan detailing the proposed earthworks and retaining methods.
The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
KHA DEVELOPMENT MANAGERS
Scott Sobey
DIRECTOR
Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.