Skip to the record
Accept no substitutions.

Original source · versioned page text

Information Response

Attached to the e-mail MCU15/0068 - Response to Information Request.

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Street Presentation
There is considerable height from the driveway to the first floor unit which presents open and high to
the street.

3. Provide options which will address the presentation to the street.

Response:
Refer Amended Proposal Plans which provide for 4 x 45lt trees to the street frontage to provide
buffering and amenity benefit to the street presentation.

Earthworks
The proposed building will require earthworks including excavation to a depth of approximately 6m
near the southwest part of the site.

4. Provide a preliminary engineering/geotechnical assessment that includes:
        (a) A plan that indicates the cut and fill to be carried out on the site
        (b) Earth retaining methods during construction and proposed measures to ensure stability of
            adjacent properties and buildings.

Response:
Refer Earthworks Retaining Plan detailing the proposed earthworks and retaining methods.


The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.

Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
KHA DEVELOPMENT MANAGERS




Scott Sobey
DIRECTOR
Email: [email protected]
Log in to download the original file

Information Response.pdf · 324 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.