                 ENGINEERING
                             Site Access and Driveways
                 11.    A sealed access driveway must be provided from Mossman Court to all parking and
                        manoeuvring areas of the development. These proposed works must be undertaken
                        with written approval in accordance with Noosa Council driveway crossover approval
                        conditions and adopted standard drawings for the crossover type as required by the
                        planning scheme.
                 12.    The driveway must be constructed to grades that ensure that vehicles will not bottom
                        out or scrap on the driveway or the road formation when entering and exiting the site.
                        Stormwater Drainage
                 13.    The site must be provided with a stormwater drainage system connecting to a lawful
                        point of discharge. The works must be undertaken generally in accordance with SCG’s
                        drawing 31192-SW1.1 “Stormwater Management Plan”, dated July 2021.
                 14.    The site specific SWMP must be approved as part of the subsequent Building Permit.
                 15.    The site specific SWMP must be consistent with the site-specific geotechnical report’s
                        recommendations.
                 16.    The development works must not cause additional ponding of water on any adjoining
                        property (including the road reserve), or concentrate or direct overland flow to any
                        adjoining property.
                 17.    Private drainage structures must be wholly contained within the subject site.
                        Easements
                 18.    Unless otherwise agreed in writing by the relevant service provider, any public or third
                        party infrastructure located on the subject site must be placed within an easement
                        registered against the title of the property.
                 19.    All easements must be designed in accordance with the planning scheme and granted
                        at no cost to the Grantee. Where the Grantee is Council or a service authority, the
                        easement documentation must be in accordance with the Grantee’s standard easement
                        terms. Draft easement documentation must be submitted to Council for endorsement.
                 20.    All works must be kept clear of any existing or proposed easements on the subject land,
                        unless agreed otherwise in writing by the Grantee.
                        Earthworks and Retaining Walls
                 21.    All earthworks must be undertaken generally in accordance with:
                        a.      SCG’s drawing 31192-OW3.1 “Earthworks Plan”, dated July 2021;
                        b.      the findings and recommendations of Douglas Partners’ report 206126.00
                                “Preliminary Geotechnical Investigation”, dated 1 August 2021; and
                        c.      the findings and recommendations of ADG Consulting’s report ADG1304.21
                                “Dewatering Management Plan”, Rev 0, dated October 2021
                 22.    All earthworks must be endorsed through the building permit.
                 23.    The site specific geotechnical report must be consistent with the site specific SWMP’s
                        recommendations.
                 24.    All earthworks must be supervised by a Registered Professional Engineer of
                        Queensland (RPEQ).




                                                                                                        Page 3 of 5
Document Set ID: 21837427
Version: 2, Version Date: 01/03/2022

Used in these records

About this file

File size
129 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001 ECM_21837427_v2_Referral Agency Response - Planning RAP21 0028.pdf · 129 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.