001 ECM_21837427_v2_Referral Agency Response - Planning RAP21 0028 · MCU24/0032
ENGINEERING
Site Access and Driveways
11. A sealed access driveway must be provided from Mossman Court to all parking and
manoeuvring areas of the development. These proposed works must be undertaken
with written approval in accordance with Noosa Council driveway crossover approval
conditions and adopted standard drawings for the crossover type as required by the
planning scheme.
12. The driveway must be constructed to grades that ensure that vehicles will not bottom
out or scrap on the driveway or the road formation when entering and exiting the site.
Stormwater Drainage
13. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken generally in accordance with SCG’s
drawing 31192-SW1.1 “Stormwater Management Plan”, dated July 2021.
14. The site specific SWMP must be approved as part of the subsequent Building Permit.
15. The site specific SWMP must be consistent with the site-specific geotechnical report’s
recommendations.
16. The development works must not cause additional ponding of water on any adjoining
property (including the road reserve), or concentrate or direct overland flow to any
adjoining property.
17. Private drainage structures must be wholly contained within the subject site.
Easements
18. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
19. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
20. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
21. All earthworks must be undertaken generally in accordance with:
a. SCG’s drawing 31192-OW3.1 “Earthworks Plan”, dated July 2021;
b. the findings and recommendations of Douglas Partners’ report 206126.00
“Preliminary Geotechnical Investigation”, dated 1 August 2021; and
c. the findings and recommendations of ADG Consulting’s report ADG1304.21
“Dewatering Management Plan”, Rev 0, dated October 2021
22. All earthworks must be endorsed through the building permit.
23. The site specific geotechnical report must be consistent with the site specific SWMP’s
recommendations.
24. All earthworks must be supervised by a Registered Professional Engineer of
Queensland (RPEQ).
Page 3 of 5
Document Set ID: 21837427
Version: 2, Version Date: 01/03/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records