NOOSA COUNCIL IDAS Development Application Decision Notice                                                              5


24.      The sewer connection to the site shall be in accordance with Council’s standards and requirements at no
         cost to Council. The applicant is advised that a Compliance Permit for all plumbing and drainage works
         within the boundaries of the development site shall be obtained from Council’s Plumbing Services Section
         prior to obtaining a Development Permit for Building Works.
Town Water Supply

25.      The site shall be connected to Council’s existing town water supply in Allambi Rise and be constructed in
         accordance with Council’s standards and requirements at no cost to Council.

26.      Each water connection to the water reticulation system shall extend to the property boundary and be
         metered.
Geotechnical Issues/Construction

27.      All construction works on site shall accord with the Geotechnical Reports prepared by Golder Associates
         dated July 2003 and Morrison Geotchnic dated 23 November 2006 and subsequent reports specific to the
         amended design (including the pool), subject to amendments to address condition No. 43, with cut and fill
         for retaining walls not to exceed a maximum depth of 1.5 metres.
         The applicant’s geotechnical engineer is required to be on site for the whole of the time during any
         excavation and house foundations including the construction of the retaining walls and the footing for the
         falsework. Such work shall only be carried out during dry weather conditions. The geotechnical engineer
         shall also inspect the site periodically throughout the construction of the dwelling and certify the stability of
         the structure upon its completion. Should any risk of sand movement occur - all work shall be suspended
         until steps (approved by the Geotechnical engineer) have been taken to ensure that no further slippage
         will result.

28.      The disposal of sand, soil or any materials created by the construction of the dwellings shall be removed
         in accordance with the Construction Management Plan. Details of the method of this disposal of materials
         are to be submitted to Council at the Building Application stage. Not more than one vehicle at a particular
         time will be parked in Park Road for the removal of, or the delivery of, materials associated with the site
         and no such vehicle shall remain overnight. No materials are permitted to be stored within the road
         reserve.

29.      A programme of works is to be submitted with any application for any Development Permit for Operational
         Works detailing the construction schedule and proposed environmental protection measures, including a
         vegetation management plan, which addresses stabilisation of disturbed areas.

         Where the program is changed for any reason whatsoever, a copy of the revised program shall be
         submitted to Council’s Works Inspector within seven (7) days.

30.      A Traffic Management Plan for the Construction of the Dwelling addressing the access to the site, the
         locating of equipment, carparking arrangements for workers on the site and any potential conflicts with
         local traffic shall be submitted to Council for approval prior to works commencing on site.

31.      Prior to the issue of Building Permit the builder shall submit written acknowledgment that building works
         shall proceed in accordance with the 9 tonne load limit applicable to Park Road, unless varied by Council.

32.      At the completion of construction the consulting geotechnical engineer will certify that all works were
         carried out in accordance with their recommendations and that the structures and the site are stable.

33.      A Condition Survey is to be carried out on adjoining buildings, structures and services prior to any
         construction works taking place on site. If distress already exists, a photographic survey shall be
         undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A
         copy of this report is to be submitted to Council within 5 business days of survey and prior to construction
         work proceeding.

34.      The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use
         of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating,
         earthmoving or demolition machinery or other similar construction techniques.




SEP o:\database\onestop\decision.doc

Used in these records

About this file

File size
50 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED COMPILED Decision Notice [As Published].pdf · 50 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.