Stormwater Management Plan
Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Very large file (13.4 MB): may take a few minutes to open.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
GOOD SHEPHERD LUTHERAN COLLEGE Odyssey Consulting Group Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 5.3.5 Reporting An inspection report shall be written by a suitably qualified and experienced scientist/engineer following each water quality monitoring episode. The report shall include at least the following information. Name, address and real property description for the development site; Council file reference number (if known); Monitoring locations; Performance criteria; Results for each monitoring location, identifying any breaches of performance criteria, and Recommended corrective actions to be taken and additional sediment and erosion controls, if required. Inspection reports shall be provided to the contractor for their action and compilation in an on-site register. If the above-mentioned performance criteria are exceeded and results from the downstream monitoring stations show significant deterioration from upstream results (if applicable), the contractor shall implement all recommendation of the inspection report within (1) working day of receipt of the report. 5.4 Operational Phase The following sections provide details of the stormwater quality improvement devices (SQID’s) proposed for the operational phase of the development. Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/D) and Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/C) included as Appendix F illustrates the size and location of the proposed SQID’s. MUSIC Version 6.1.0 has been used for modelling of the proposed treatment train. 5.4.1 Stormwater Quality Improvement Devices Site runoff from Catchment A1 and Catchment B will be directed onto permeable pavements before draining into two bio-retention basins located at the South and West of the site. Catchment A2 will bypass permeable pavement and be directed into the bio-retention basin on the west of the site. For further details see Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/D) included in Appendix F. The proposed treatment train for the development is shown in Figure 4. K4277-0002-C 05 November 2018 Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.