Stormwater Management Plan
Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Very large file (13.4 MB): may take a few minutes to open.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
GOOD SHEPHERD LUTHERAN COLLEGE Odyssey Consulting Group Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 Figure 4: Music Modelling Treatment Train 5.4.2 Design Parameters of the Stormwater Quality Improvement System Detailed design of the stormwater treatment train shall be in accordance with the WSUD, Technical Design Guidelines for South East Queensland – Version 1 (June 2006). BIO-RETENTION BASINS A bio-retention basin is designed to pond stormwater allowing it to percolate through a layer of filter media, typically sandy loam. Runoff passing through the filter media is collected with perforated pipe discharging to the downstream drainage infrastructure. The Bio-retention basins shall be located to treat all stormwater from development area. The bio-retention basins have been modelled with the following properties: Filter media Sandy Loam; 5 – 10% Organic Content in accordance with AS1289.4.1.1; Average D50 0.45 mm; Ksat 180 mm/hr; TN Content = 400 mg/kg Orthophosphate Content = 20 mg/kg Filter media depth 0.40 m; Drainage layer 0.20 m; Extended detention depth 0.30 m; Seepage 0 mm/hr; 2 2 Filter Area Basin 1: 20m , Basin 2: 4m ; 2 2 Surface Area Basin 1: 20m , Basin 2: 4m . K4277-0002-C 05 November 2018 Page 13 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.