Skip to the record
Accept no imitations.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (13.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

GOOD SHEPHERD LUTHERAN COLLEGE                                                               Odyssey Consulting Group
Lot 30 on SP170751                                                            Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                  Project No: K4277

         Vegetation maintenance will include:
                Fertilising plants;
                Removal of noxious plants or weeds; and
                Re-establishment of plants that die.

         Sediments accumulated at the inlets need to be monitored. Depending on the catchment activities
         the deposition of sediment can tend to smother plants and reduce the ponding volume available.
         Should excessive sediment build-up it will impact on the plant health and require removal before it
         reduces the infiltration rate of the filter media. The proposed SQIDs will require regular maintenance
         and monitoring to ensure that they function as designed.

         Table 16:           Bio-retention Basin Maintenance Schedule

             Bio-retention Basin Maintenance Checklist

             Inspection Frequency: 3 Monthly                                 Date of Visit:

             Location:

             Description:

             Site Visibility:

                                                                                                  Action Required
             Inspection Items                                                Yes       No
                                                                                                      (Details)

             Sediment accumulation at inflow points?

             Litter basin?

             Erosion at inlet or other key structures (e.g. crossovers)?

             Traffic damage present?

             Evidence of dumping (Building waste, oils etc)?

             Vegetation condition satisfactory (density, weeds etc)?

             Replanting required?

             Mowing required?

             Clogging of drainage points (sediment or debris)?

             Evidence of ponding?

             Damage/vandalism to structures present?

             Surface clogging visible?

             Drainage system inspected?

             Resettling of system required?

             Comments:




6.2      Permeable Pavement Maintenance
         Sediment accumulated over the permeable pavement needs to be monitored to ensure the
         permeability of the pavement is not reduced. The proposed SQIDs will require regular maintenance
         and monitoring to ensure that they function as designed.




K4277-0002-C                                              05 November 2018                              Page 15 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.