Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.
Plans and drawings: the text below has words only, no drawings.
Very large file (13.4 MB): may take a few minutes to open.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
GOOD SHEPHERD LUTHERAN COLLEGE Odyssey Consulting Group Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 Maintenance is primarily concerned with: Maintenance of flow to and across the permeable pavement; Preventing undesired overgrowth vegetation; Removal of accumulated sediments; and Litter and debris removal. Maintenance will include: Pressure washing permeable pavers every 12 months. 7.0 CONCLUSIONS Odyssey Consulting Group has been commissioned by Good Shepherd Lutheran College to prepare a Conceptual Stormwater Management Plan (CSWMP) for the Proposed Carpark at 115 Eumundi Noosa Road, Noosaville. This CSWMP details the conceptual planning, layout and design of the stormwater management infrastructure for both the construction and operational phases of this development. Hydraulic analysis demonstrated that the development will result in an increase in peak runoff as 3 compared with the pre development scenario. An open-air detention basin with 126 m of volume is proposed to mitigate the increase in flows from the development. 2 2 2 A combination of two bio retention basins, 20 m and 4m respectively and 219m of permeable pavement is proposed for the operational phase of the development to treat stormwater runoff. A sediment and erosion control plan is provided for the construction phase of the development and shall be implemented by the contractor and developer. K4277-0002-C 05 November 2018 Page 16 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.