Stormwater Management Plan

Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (13.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

GOOD SHEPHERD LUTHERAN COLLEGE                                                                                                            Odyssey Consulting Group
Lot 30 on SP170751                                                                                                         Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                                                               Project No: K4277


TABLE OF CONTENTS
1.0     INTRODUCTION .................................................................................................................................................. 1
         1.1     Background ................................................................................................................................................ 1
         1.2     Scope .......................................................................................................................................................... 1
2.0     DESCRIPTION OF SUBJECT SITE ........................................................................................................................... 2
         2.1     Location...................................................................................................................................................... 2
                 2.1.1       Site Topography.......................................................................................................................... 2
                 2.1.2       Vegetation and Land Use ........................................................................................................... 2
         2.2     Proposed Development.............................................................................................................................. 3
3.0     SITE HYDROLOGY AND HYDRAULICS ................................................................................................................... 3
         3.1     Background ................................................................................................................................................ 3
         3.2     Predevelopment ......................................................................................................................................... 3
                 3.2.1       Catchment Definition and Lawful Point of Discharge ................................................................. 3
                 3.2.2       Coefficient of Runoff ................................................................................................................... 3
                 3.2.3       Time of Concentration ................................................................................................................ 4
                 3.2.4       Design Flow Rates ...................................................................................................................... 4
         3.3     Post Development ...................................................................................................................................... 4
                 3.3.1       Catchment Definition and Lawful Point of Discharge ................................................................. 4
                 3.3.2       Coefficient of Runoff ................................................................................................................... 5
                 3.3.3       Time of Concentration ................................................................................................................ 5
                 3.3.4       Design Flow Rates ...................................................................................................................... 5
         3.4     External Catchments .................................................................................................................................. 6
                 3.4.1       Catchment Definition.................................................................................................................. 6
                 3.4.2       Coefficient of Runoff ................................................................................................................... 6
                 3.4.3       Time of Concentration ................................................................................................................ 6
                 3.4.4       Design Flow Rates ...................................................................................................................... 6
                 3.4.5       External Catchment Channel Conveyance .................................................................................. 7
4.0     STORMWATER DETENTION ................................................................................................................................. 7
         4.1     Objective .................................................................................................................................................... 7
         4.2     Hydraulic Model ......................................................................................................................................... 7
         4.3     Detention Volume ...................................................................................................................................... 8
5.0     WATER QUALITY ASSESSMENT ........................................................................................................................... 9
         5.1     Background ................................................................................................................................................ 9
         5.2     Water Quality Objectives ......................................................................................................................... 10
         5.3     Construction Phase .................................................................................................................................. 10
                 5.3.1       Common Pollutants .................................................................................................................. 10
                 5.3.2       Performance Criteria ................................................................................................................ 10
                 5.3.3       Sediment and Erosion Controls ................................................................................................. 11
                 5.3.4       Water Quality Monitoring and Inspections .............................................................................. 11
                 5.3.5       Reporting .................................................................................................................................. 12
         5.4     Operational Phase .................................................................................................................................... 12
                 5.4.1       Stormwater Quality Improvement Devices ............................................................................... 12
                 5.4.2       Design Parameters of the Stormwater Quality Improvement System ...................................... 13
                 5.4.3       Post Development Modelling Results - Mitigated .................................................................... 14
6.0     OPERATIONAL PHASE MAINTENANCE REQUIREMENTS ......................................................................................14
         6.1     Bio-retention Basin Maintenance ............................................................................................................ 14
         6.2     Permeable Pavement Maintenance ......................................................................................................... 15
7.0     CONCLUSIONS ...................................................................................................................................................16




K4277-0002-C                                                              05 November 2018                                                                          Page ii of iii
Log in to download the original file

Stormwater Management Plan.pdf · 13.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.