Stormwater Management Plan

Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (13.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

GOOD SHEPHERD LUTHERAN COLLEGE                                                                                                          Odyssey Consulting Group
Lot 30 on SP170751                                                                                                       Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                                                             Project No: K4277


FIGURES
Figure 1:        Subject Site - Locality Plan (modified from maps.google.com.au) ................................................................. 2
Figure 2:        Aerial Photograph (modified from google maps.google.com.au) .................................................................. 3
Figure 3:        Mitigated Post Development Catchment Q100 Flow Rates ........................................................................... 9
Figure 4:        Music Modelling Treatment Train ................................................................................................................ 13



TABLES
Table 1:         Site Description .............................................................................................................................................. 1
Table 2:         Pre Development Coefficients of Runoff........................................................................................................ 4
Table 3:         Pre Development Time of Concentration ...................................................................................................... 4
Table 4:         Catchment A - Pre Development Internal Catchment Peak Flow Rates ......................................................... 4
Table 5:         Post Development Catchment Impervious Properties ................................................................................... 5
Table 6:         Post Development Coefficients of Runoff ...................................................................................................... 5
Table 7:         Catchment A - Post Development Peak Flow Rates ....................................................................................... 5
Table 8:         External Catchment ........................................................................................................................................ 6
Table 9:         External Catchment A Peak Flow Rates .......................................................................................................... 7
Table 10:        Peak Discharge Rate for Site (m3/s) ............................................................................................................... 8
Table 11:        Detention Tank A Parameters ........................................................................................................................ 8
Table 12:        Comparison of Pre Development, Post Development and Mitigated Flow Rates for Catchment B ............... 8
Table 13:        Construction Phase Key Pollutants............................................................................................................... 10
Table 14:        Construction Phase Water Quality Performance Criteria ............................................................................ 10
Table 15:        Treatment Train Effectiveness of Proposed SQID ........................................................................................ 14
Table 16:        Bio-retention Basin Maintenance Schedule ................................................................................................. 15



APPENDICES
Appendix A       Skyline Surveyors, Contour and Detail Survey (Ref: 21 April 2017)
Appendix B       Burling Brown Architects, Site Plan (Ref: GSL06/SK02/P4)
                 Burling Brown Architects, Carpark 1 (Ref: GSL06/SK03/P5)
                 Burling Brown Architects, Carpark 2 (Ref: GSL06/SK04/P4)
Appendix C       Odyssey Consulting Group, Pre Development Catchment Plan (Ref: K4277/P005/B)
Appendix D       Odyssey Consulting Group, Post Development Catchment Plan (Ref: K4277/P006/C)
Appendix E       Odyssey Consulting Group, External Catchment Plan (Ref: K4277/P011/C)
Appendix F       Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/D)
                 Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/C)
Appendix G       Odyssey Consulting Group, Sediment and Erosion Control Plan and Details (Ref: K4277/P008/C & Ref:
                 K4277/P009/A)




K4277-0002-C                                                            05 November 2018                                                                          Page iii of iii
Log in to download the original file

Stormwater Management Plan.pdf · 13.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.