Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail Response to Info Request (Stormwater Managerment plan) - MCU18/0097.

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (13.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 5, section 1. The text section number identifies this passage in the reader.

GOOD SHEPHERD LUTHERAN COLLEGE                                                                  Odyssey Consulting Group
Lot 30 on SP170751                                                               Conceptual Stormwater Management Plan
115 Eumundi Noosa Road, Noosaville                                                                     Project No: K4277




1.0 INTRODUCTION
1.1      Background
         Odyssey Consulting Group (ODC) has been commissioned by Good Shepherd Lutheran College to
         prepare a Conceptual Stormwater Management Plan (CSWMP) for the Proposed Car Park at 115
         Eumundi Noosa Road, Noosaville.
                                                                                  2
         The subject site is described in Table 1 and has a total area of 5,014 m .

         Table 1:        Site Description

                         Developer                Lot and Property Description               Street Address

                                                                                       115 Eumundi Noosa Road,
               Good Shepherd Lutheran College         Lot 30 on SP170751
                                                                                              Noosaville


         In preparing the CSWMP ODC has considered the applicable requirements for the management of the
         stormwater quantity measures appropriate for the subject site and proposed development.

1.2      Scope
         This CSWMP details the conceptual planning, layout and design of the stormwater management
         infrastructure for both the construction and operational phases of this development.

         This CSWMP aims to:
                Establish the required performance criteria for the proposed stormwater quantity and quality
                 management systems;
                Provide a conceptual design of stormwater infrastructure including stormwater quantity and
                 quality management controls where required;
                Provide guidelines for stormwater quality during construction and operational phase;
                Ensure stormwater runoff is conveyed through the site to a lawful point of discharge in
                 accordance with QUDM and Council’s Planning Scheme Policy; and
                Provide reporting and monitoring mechanisms whereby the performance of this system can be
                 measured enabling identification of corrective actions/alterations required to ensure the above
                 mentioned objectives are maintained.

         This CSWMP has been prepared in accordance with the IEAust, (National Committee on Water
         Engineering), Australian Runoff Quality (Draft), Queensland Urban Drainage Manual (QUDM) and
         Noosa Shire Council, Noosa Plan 2006.




K4277-0002-C                                       05 November 2018                                         Page 1 of 16
Log in to download the original file

Stormwater Management Plan.pdf · 13.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.