Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Approved Plans OPW21-0038

of 24

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.    FINDINGS

3.0    Site trees for protection are two young “Alexandra Palms” (Arcontophoenix aleaxandrae) and a
      young “Weeping Lillypilly” (Syzygium luehmannii) both are in excellent condition.

3.1   All other vegetation will be compromised with construction plans and will require removal. There
      are no trees of significance that require removal.

3.2   The calculated TPZ for the “Alexandra Palms” is approx. 2 metres and the TPZ for the “Lillypilly” is
      approx. 2.5 metres. This means that no works of any kind can be undertaken within this zone
      unless the Project Arborist is involved.

3.3   TPZ’s should be determined and clearly marked out prior to any tree removal or site works. ATF
      fencing or similar should be set out to limit root damage of the protected tree.
      Tree removals must be undertaken with care and root balls should be stump ground when close
      to protected trees. Any works within TPZ’s should be supervised by the Project Arborist.

3.4   All retained trees require mulching of the TPZ’s using good quality forest mulch. Root pruning
      using Air spade or a vacuum excavation process is recommended for any works within 1 metre of
      TPZ’s.


4. IMAGES




                                                                                                         Page 5 of 11
Log in to download the original file

Approved Plans OPW21-0038.pdf · 12.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.