Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

MCU22/0051 Application For Material Change Of Use Hardware & Trade Supplies At 178 Eumundi Noosa Road, Noosaville · Attachment 1 - MCU220051 – Proposed Conditions

of 7

Page text shows just the words. Original shows the document exactly as it was published.

16.   All landscape works must be established and maintained in accordance with the approved
      design for the life of the development, and in a manner that ensures healthy, sustained and
      vigorous plant growth. All plant material must be allowed to grow to full form and be
      refurbished when its life expectancy is reached.
      Fauna Management
17.   Vegetation must only be removed or disturbed in accordance with a Fauna Management
      Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
      Works approval.
      *(Refer to Advisory Note)
      Waste Management
18.   A waste storage area must be designed and maintained in accordance with Planning
      Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
      The waste storage area must be:
      a.    imperviously paved and correctly sized for all refuse and recycling containers;
      b.    bunded and graded so that wastewater and bin leakage drain to the sewer;
      c.    provided with a conveniently located hosecock and backflow prevention device,
            connected to a water supply to service the area; and
      d.    roofed or otherwise covered.
19.   A Waste Management Plan must be prepared that details the type and quantity of waste
      material that is likely to be generated by the development; where and how the waste will be
      stored, disposed of and procedures for handling the waste. The Waste Management Plan
      must be submitted and approved by Council prior to the issue of a Development Permit for
      Operational Works.
      Performance Bond
20.   Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
      be submitted to Council, to secure performance of all conditions of this approval, prior to the
      issue of a Development Permit for Operational Works. The cash bond or trading bank
      guarantee will be returned on performance of the conditions of approval less any costs
      incurred by Council in respect of enforcing performance of this permit. Council reserves the
      right to call upon the bond or guaranteed sum to effect compliance with conditions.
      Acid Sulfate Soil
21.   The disturbance and release of Acid Sulphate Soils must be avoided by:
      a.    Undertaking an Acid Sulfate Soils investigation and soil analysis pursuant to the
            National Acid Sulfate Soils Guidance.
      b.    not excavating or otherwise removing soil or sediment containing ASS;
      c.    not permanently or temporarily extracting groundwater that results in the aeration of
            previously saturated ASS; and
      d.    not undertaking filling on land at or below 5 metres AHD that results in:-
            i.    actual ASS being moved below the water table; or previously saturated ASS
                  being aerated.
      Where potential or actual Acid Sulfate Soil is identified, all works must be caried out in
      accordance with an Acid Sulfate Soils Management Plan prepared by a qualified person*.
      *(Refer to Advisory Note)
Log in to download the original file

ATTACHMENT 1 - MCU220051 – PROPOSED CONDITIONS.pdf · 101 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.