MCU22/0051 Application For Material Change Of Use Hardware & Trade Supplies At 178 Eumundi Noosa Road, Noosaville · Attachment 1 - MCU220051 – Proposed Conditions
c. Adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.
d. Signage and lighting at strategic locations to direct people to building entries and public
toilet facilities.
e. Pedestrian refuge areas at strategic locations within the carpark to ensure safe and
convenient congregating of pedestrians waiting to cross major access driveways.
f. A total of 2 bicycle parking spaces
g. End of trip facilities involving 2 lockers, male and female showers and change rooms.
Condition 28a is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
29. Carry out the development to ensure that adjoining properties, reserves and roads are
protected from ponding or nuisance from stormwater as a result of any works undertaken.
30. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval, AS3500.3 and the Queensland Urban Drainage Manual, and must include in
particular:
a. Underground detention tanks and drainage works generally as shown in Appendix C
of the Site Based Stormwater Management Plan Rev 07, prepared by ACOR
Consultants, dated 24/08/2023
b. Collection and discharge of stormwater to Council’s underground pipe network in
Gateway Drive
c. Extension of the site stormwater system to accommodate stormwater from the external
catchment East of the site, including registration of drainage easements over the pipe
network within the subject site in favour of the upstream lot.
d. Cut off drains along the Eastern site boundary to convey external catchment flows up
to the 1%AEP climate change event into the pipe network within the site
e. The use of gravity stormwater drainage and not surcharge pits.
Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Quality Management
31. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the Bioretention
Technical Design Guidelines (Water by Design, 2014), and must include in particular:
a. Stormwater quality treatment devices of a size and location generally in accordance
with those shown in Appendix C of the Site Based Stormwater Management Plan Rev
07, prepared by ACOR Consultants, dated 24/08/2023
b. A minimum 5kL rainwater harvesting tank, plumbed to supply toilet flushing and
landscape irrigation
c. Bioretention devices which:
i. Are designed generally in accordance with IPWEAQ Standard Drawing No. DS-
073.
ii. Are provided with a free-draining outlet from the sub-soil drainage system.
d. Incorporation of a primary stormwater quality treatment system for the effective
removal of gross pollutants.