Original source · versioned page text
2017-03-13 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 23 of 34
Infrastructure Services
March 2017
( DIRECTOR >)
INFRASTRUCTURE Project & Business
Support
SERVICES 3 EFT
; SEE EI yy
Infrastructure Planning, Seay ai at :
Design & Delivery Asset oo Buildings & Facilities Civil Operations
3 EFT 91.2 EFT
13.6 EFT
: *2 Additional Roles
: proposed — subject to :
| budget :
Note — Fixed term appointments approved by Council as part of the 16/17 budget are not included within the EFT totals as shown on this structure.
Further details are available on the individual branch/team structures. Positions recommended from 2017 Service Reviews are also not included. Total EFT: 115.8
Page 23 of 34See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.