PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 AUGUST 2019
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of
$20,000.00 must be submitted to Council, to secure performance of all conditions of
this approval, prior to the issue of a Development Permit for Operational Works. The
cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Building Appearance
7. All air conditioning units or other mechanical equipment must be located at ground
level, or otherwise fully enclosed or screened such that they are not visible from the
street frontages nor adjoining properties.
8. All terrace areas above ground floor must not be enclosed by permanent fixtures
such as shutters, louvres, glass panelling or the like, except where required to satisfy
any privacy condition of this Decision Notice.
Fencing and Walls
9. Any street fencing must be set back an average of 1 metre from the front property
boundary. Any fencing on the front boundary must either:
a. not exceed a maximum height of 1.2m
b. be of open construction.
10. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street.
Clothes Drying Areas
11. Each dwelling unit must be provided with access to an outdoor clothes line which is
screened from public view.
Waste Storage
12. The development must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9, Waste Management, including an external
imperviously paved area correctly sized for all refuse and recycling containers and
suitably screened from public places and neighbouring properties.
13. The waste management facilities should ensure recyclables bins are appropriately
sited and accessible, and/or provided with their own waste shute, to ensure
recyclable waste is not placed in the general waste shute.
14. The site must be provided with a bin wash area with a cold-water tap, hose and drain
outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to
prevent storm water entry to the sewerage system which can be achieved by a
bunded area, with a nib wall height of 100mm maximum, enclosing a wash area of
700mm x 700mm minimum (max 0.7m²). Alternatively, the waste area can be roofed,
or any other appropriate design approved by Council.
Protection of Privacy
15. To ensure privacy is protected between adjoining properties, any windows located on
the southern building face of Level 2 and Level 3 must either:
a. have a minimum window sill height or 1.5 metres above floor level
b. be fitted with translucent glazing
c. be fitted with a fixed external screen
Page 5 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.