PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 AUGUST 2019
16. The upper level terrace located on the southern building face of Level 2 and Level 3
must include either balcony planter boxes, balustrading or fixed external screens,
positioned in such a way to obscure direct views into the habitable room windows or
private open space areas of the adjoining property.
Landscaping Works
17. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area.
18. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
Retention of Existing Trees
19. The existing Mango tree located at the rear of the site must be retained in
accordance with an Arborist Report (or part thereof) prepared by a qualified person*
and endorsed through an Operational Works approval. The report must address the
mitigation of impacts from footings and other services within the tree protection zone,
as defined by Australian Standard 4970-2009 Protection of trees on
development sites.
*(Refer to Advisory Note)
Community Management Statement
20. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
21. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice.
Land Amalgamation
22. All properties the subject of the development must be amalgamated prior to the
commencement of use.
Water & Sewer Connections
23. An underground connection to reticulated water and sewerage must be provided to
the development site in accordance with the standards and requirements of Northern
SEQ Distributor–Retailer Authority (Unitywater).
24. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
ENGINEERING
External Frontage Works
25. A new 2.0m wide concrete footpath must be provided within the road verge for the
entire length of the frontage of the site. The path must match with the existing
grassed verge without causing a trip hazard. The works must be undertaken in
accordance with an Operational Works approval and must include/address the
following:
a. Be in compliance with IPWEAQ standard drawing SEQ R-065 Concrete
Pathway Construction Details.
Page 6 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.