PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 AUGUST 2019
34. The development of the site must not worsen existing drainage conditions on other
properties by diverting stormwater runoff or cause additional stormwater ponding on
any other property.
35. Adequate overland flowpath/s and/or pipeline/s to convey stormwater runoff to ensure
no worsening impacts are caused on other properties during major storm events (eg
1% AEP) due to the proposed development.
36. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
37. All earthworks and associated retaining works, including for the construction phase,
must be carried out in compliance with an Operational Works Development Permit.
38. A site-specific geotechnical investigation for the development must be prepared by a
suitably qualified person* and submitted to Council prior to the issue of any
Development Permit for Operational Works.
39. All earthworks and associated batters/retaining walls must be contained entirely
within the subject site unless written permission from the respective landowner(s) is
provided to Council.
40. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments, Council’s codes and relevant government regulations and guidelines.
Certification must be provided by an RPEQ and submitted to Council prior to the
issue of the Certificate of Classification for the building.
41. The development works, including earthworks and retaining works, must not
adversely impact on the stability and the structural integrity of any other property or
private or public structure. Any conflict between the development and an existing or
proposed service must be referred to the relevant service authority for determination
prior to submitting application for Operational Works.
42. Earthworks and development works carried out on site must not affect the structural
integrity of any of the existing fences or structures that border the site. Fences that
are affected shall be replaced prior to the Building Certifier issuing the Certificate of
Classification.
43. A Construction Management Plan must be submitted to Council for endorsement
prior to the issue of Operational Works permit and must specifically address the
following:
a. Traffic Management during all aspects of the construct phase including:
(i) A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and
traffic control measures prior to construction commencing.
(ii) Details on the haulage route (for excavated materials and/or imported fill)
type of vehicle to be utilised and frequency of usage.
NOTE: any damage to the existing road system as a result of haulage
operations must be fully repaired at the applicant’s expense
(iii) Maintenance of safe pedestrian and cyclists access across the frontage
of the site both during daily construction and after daily construction has
ceased for all stages of development.
(iv) Fencing to the site during the construction phase of the development.
(v) Providing safe and adequate parking arrangements for all machinery and
cars during construction phase without adversely impacting on the traffic
Page 8 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.