PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  6 AUGUST 2019


    34.   The development of the site must not worsen existing drainage conditions on other
          properties by diverting stormwater runoff or cause additional stormwater ponding on
          any other property.
    35.   Adequate overland flowpath/s and/or pipeline/s to convey stormwater runoff to ensure
          no worsening impacts are caused on other properties during major storm events (eg
          1% AEP) due to the proposed development.
    36.   Stormwater runoff from the development must be disposed of on-site without causing
          scour or damage to the subject site or any adjoining property.
          Earthworks and Retaining Walls
    37.   All earthworks and associated retaining works, including for the construction phase,
          must be carried out in compliance with an Operational Works Development Permit.
    38.   A site-specific geotechnical investigation for the development must be prepared by a
          suitably qualified person* and submitted to Council prior to the issue of any
          Development Permit for Operational Works.
    39.   All earthworks and associated batters/retaining walls must be contained entirely
          within the subject site unless written permission from the respective landowner(s) is
          provided to Council.
    40.   All earthworks must be undertaken in accordance with the provisions of Australian
          Standard AS3798: Guidelines on Earthworks for Commercial and Residential
          Developments, Council’s codes and relevant government regulations and guidelines.
          Certification must be provided by an RPEQ and submitted to Council prior to the
          issue of the Certificate of Classification for the building.
    41.   The development works, including earthworks and retaining works, must not
          adversely impact on the stability and the structural integrity of any other property or
          private or public structure. Any conflict between the development and an existing or
          proposed service must be referred to the relevant service authority for determination
          prior to submitting application for Operational Works.
    42.   Earthworks and development works carried out on site must not affect the structural
          integrity of any of the existing fences or structures that border the site. Fences that
          are affected shall be replaced prior to the Building Certifier issuing the Certificate of
          Classification.
    43.   A Construction Management Plan must be submitted to Council for endorsement
          prior to the issue of Operational Works permit and must specifically address the
          following:
          a.    Traffic Management during all aspects of the construct phase including:
                (i)     A Traffic Management Control Plan in accordance with Manual of Uniform
                        Traffic Control Devices (MUTCD) detailing all temporary signage and
                        traffic control measures prior to construction commencing.
                (ii)    Details on the haulage route (for excavated materials and/or imported fill)
                        type of vehicle to be utilised and frequency of usage.
                        NOTE: any damage to the existing road system as a result of haulage
                        operations must be fully repaired at the applicant’s expense
                (iii)   Maintenance of safe pedestrian and cyclists access across the frontage
                        of the site both during daily construction and after daily construction has
                        ceased for all stages of development.
                (iv)    Fencing to the site during the construction phase of the development.
                (v)     Providing safe and adequate parking arrangements for all machinery and
                        cars during construction phase without adversely impacting on the traffic

                                                                                     Page 8 of 70
Log in to download the original file

2019-08-06 Planning & Environment Committee Agenda(PDF, 8MB).pdf · 8.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.