PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               6 AUGUST 2019


          b.   Be extended to smoothly tapered and join with the existing path along Gympie
               Terrace.
    26.   The installation and/or modification of any traffic/parking signs, line marking and
          Raised Reflective Pavement Markings (RRPMs) must be in accordance with the
          Manual of Uniform Traffic Control Devices (MUTCD). New or relocated signage must
          be installed using the VLok installation system. All new signage must be Class 1
          retroreflective material in accordance with AS 1906.1, Retroreflective materials and
          devices for road traffic control purposes – Part 1: Retroreflective sheeting.
          The works must be carried out in accordance with an Operational Works approval
          and must include in particular:
          a.   Adjustment and/or relocation of existing on-street parking spaces.
          b.   Modification to the line marking for the existing bus stop in line with Council’s
               adopted Preferred Bus Stop Treatment plan.
          Reinstatement Works
    27.   All redundant driveways and kerb laybacks must be removed, and the kerb line and
          verge area reinstated and landscaped to match the existing kerb and/or verge
          treatments. Grassed verge areas to be reinstated must be provided with 100mm
          topsoil and turf, and must be maintained by the developer until established. The
          works must be undertaken in accordance with an Operational Works approval.
    28.   All redundant stormwater pipes and kerb outlets must be removed, and verge area
          reinstated and landscaped to match the verge treatments.
    29.   Any badly damaged kerb and channel along the frontage of the site must be repaired
          to the reasonable satisfaction of Council’s representative.
          Site Access and Driveways
    30.   A sealed access driveway must be provided from Gympie Terrace to all parking and
          manoeuvring areas of the development. The works must be undertaken in
          accordance with an Operational Works approval and must include in particular:
          a.   Driveway crossovers in accordance with IPWEAQ standard drawings R-049
               and R-050 to grades prevent vehicles from scraping and/or bottoming whilst
               also allowing for compliant grades for the footpath and pedestrians movements
               along the footpath and the grassed verge without any step or trip hazard.
          Car Parking
    31.   Car parking and manoeuvring areas must be provided within the site generally as
          shown on the approved plans. The works must be undertaken in accordance with an
          Operational Works approval and must be in compliance with the provisions of
          AS/NZS 2890.1-2004 with allowance for standard vehicle to enter and leave the site
          in a forward gear and with a minimum head clearance (headroom) at any point of
          2.2m.
    32.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
          Stormwater Drainage
    33.   The site must be provided with a stormwater drainage system connecting to a lawful
          point/s of discharge. The works must be undertaken in accordance with an
          Operational Works approval in compliance with the relevant sections of Queensland
          Urban Drainage Manual and supported by a detailed stormwater drainage design
          prepared and certified by a suitably qualified and experienced Registered
          Professional Civil Engineer (RPEQ).


                                                                                    Page 7 of 70
Log in to download the original file

2019-08-06 Planning & Environment Committee Agenda(PDF, 8MB).pdf · 8.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.