2019-08-06 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 AUGUST 2019
b. Be extended to smoothly tapered and join with the existing path along Gympie
Terrace.
26. The installation and/or modification of any traffic/parking signs, line marking and
Raised Reflective Pavement Markings (RRPMs) must be in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD). New or relocated signage must
be installed using the VLok installation system. All new signage must be Class 1
retroreflective material in accordance with AS 1906.1, Retroreflective materials and
devices for road traffic control purposes – Part 1: Retroreflective sheeting.
The works must be carried out in accordance with an Operational Works approval
and must include in particular:
a. Adjustment and/or relocation of existing on-street parking spaces.
b. Modification to the line marking for the existing bus stop in line with Council’s
adopted Preferred Bus Stop Treatment plan.
Reinstatement Works
27. All redundant driveways and kerb laybacks must be removed, and the kerb line and
verge area reinstated and landscaped to match the existing kerb and/or verge
treatments. Grassed verge areas to be reinstated must be provided with 100mm
topsoil and turf, and must be maintained by the developer until established. The
works must be undertaken in accordance with an Operational Works approval.
28. All redundant stormwater pipes and kerb outlets must be removed, and verge area
reinstated and landscaped to match the verge treatments.
29. Any badly damaged kerb and channel along the frontage of the site must be repaired
to the reasonable satisfaction of Council’s representative.
Site Access and Driveways
30. A sealed access driveway must be provided from Gympie Terrace to all parking and
manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. Driveway crossovers in accordance with IPWEAQ standard drawings R-049
and R-050 to grades prevent vehicles from scraping and/or bottoming whilst
also allowing for compliant grades for the footpath and pedestrians movements
along the footpath and the grassed verge without any step or trip hazard.
Car Parking
31. Car parking and manoeuvring areas must be provided within the site generally as
shown on the approved plans. The works must be undertaken in accordance with an
Operational Works approval and must be in compliance with the provisions of
AS/NZS 2890.1-2004 with allowance for standard vehicle to enter and leave the site
in a forward gear and with a minimum head clearance (headroom) at any point of
2.2m.
32. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
33. The site must be provided with a stormwater drainage system connecting to a lawful
point/s of discharge. The works must be undertaken in accordance with an
Operational Works approval in compliance with the relevant sections of Queensland
Urban Drainage Manual and supported by a detailed stormwater drainage design
prepared and certified by a suitably qualified and experienced Registered
Professional Civil Engineer (RPEQ).
Page 7 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.