Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 9 DECEMBER 2014


      b.     maintenance and protection of water quality and existing drainage lines through the
             construction site, through the implementation of appropriate erosion and sediment
             control measures
      c.     works programme identifying key components of the works and their respective
             durations
      d.     establishment of a communication protocol with the general public, adjoining owners,
             emergency services and local businesses to advise of agreed construction times,
             impacts on traffic, services and other relevant issues
      e.     identification of complaint management procedures including:
             i.     contact details for the on-site manager
             ii.    dispute resolution procedures
      f.     details on the location of external fill sites/sources, the haulage route, type of vehicle
             to be utilised during filling operations and frequency of usage. NB any damage to the
             existing road system as a result of haulage operations shall be fully repaired at the
             applicant’s expense
      g.     it is acknowledged that the preliminary Construction Management Plan will be a draft
             document requiring finalisation upon appointment of the Principal Contractor
             employed to construct the works and a final document will be required to be
             submitted at the Pre-Start Meeting for the project.

REPORT
1.    PROPOSAL
The proposal seeks to subdivide 2 lots into 6 lots, being 5 fully serviced residential lots and a
balance lot. The residential lots range in size from 654m² to 849m² and the balance lot is
2.446ha. The lot layout is shown in Figure 1 below and is included as Attachment 1. A portion of
the balance lot is part of a 5 lot subdivision REC14/0009 and a 17 lot subdivision REC13/0146,
both of which are currently before Council. The application is before Council because of the
conflict with the Natural Resources Overlay.




Figure 1 - Lot Layout

                                                                                      Page 29 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.