g. A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks.
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
Pedestrian and Bicycle Facilities
17. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a 2 metre wide footpath within the road verge on the western side of “Masonry
Street” extending to join with the existing pathway in Cordwood Drive
b. pram ramps on both sides of “Masonry Street” at the intersection with
Cordwood Drive
c. the pathway and footbridge located generally as shown on plan number 1225-
62A dated 9/14 prepared by Callaghan and Toth excepting that the pathway
sections are to be a minimum 2 metres wide.
The footpath and footbridge to be dedicated are “non-trunk infrastructure” for the
purposes of the Sustainable Planning Act 2009.
Stormwater Drainage.
18. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval, and must include in particular:
a. The drainage structures generally as shown on the Approved Plans
b. provision of kerb adapters for all new lots that discharge into the new road
c. extension of the site stormwater system to accommodate stormwater from Lot 1
RP173883 and other applicable areas external to the site, including registration
of drainage easements
d. a maintenance path to the bioretention basin that is suitable for Council’s
maintenance vehicles
All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
19. The existing stormwater drainage system for Lots 5-7 on SP266743 must be modified
to discharge into the bioretention basin.
20. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
the Bioretention Technical Design Guidelines (Water by Design) and must include in
particular:
a. stormwater quality treatment devices generally in accordance with the
Approved Plans
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard Drawing
No. WSUD-001
ii. are designed to ensure that flows which exceed the treatment capacity of
the device avoid damaging of the filter media or subjecting the filter media
to excessive sediment loads
iii. are provided with a free-draining outlet from the sub-soil drainage system
All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
Page 43 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.