2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


          g.   A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
               Engineering Design Standards - Road, Drainage and Earthworks.
          All works to be dedicated are “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    Pedestrian and Bicycle Facilities
    17.   Pedestrian and bicycle facilities must be provided for the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.   a 2 metre wide footpath within the road verge on the western side of “Masonry
               Street” extending to join with the existing pathway in Cordwood Drive
          b.   pram ramps on both sides of “Masonry Street” at the intersection with
               Cordwood Drive
          c.   the pathway and footbridge located generally as shown on plan number 1225-
               62A dated 9/14 prepared by Callaghan and Toth excepting that the pathway
               sections are to be a minimum 2 metres wide.
          The footpath and footbridge to be dedicated are “non-trunk infrastructure” for the
          purposes of the Sustainable Planning Act 2009.
    Stormwater Drainage.
    18.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval, and must include in particular:
          a.   The drainage structures generally as shown on the Approved Plans
          b.   provision of kerb adapters for all new lots that discharge into the new road
          c.   extension of the site stormwater system to accommodate stormwater from Lot 1
               RP173883 and other applicable areas external to the site, including registration
               of drainage easements
          d.   a maintenance path to the bioretention basin that is suitable for Council’s
               maintenance vehicles
          All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.
    19.   The existing stormwater drainage system for Lots 5-7 on SP266743 must be modified
          to discharge into the bioretention basin.
    20.   A stormwater quality treatment system must be provided for the development. The
          works must be undertaken in accordance with an Operational Works approval and
          the Bioretention Technical Design Guidelines (Water by Design) and must include in
          particular:
          a.   stormwater quality treatment devices generally in accordance with the
               Approved Plans
          b.   bioretention devices which:
               i.     are designed generally in accordance with IPWEQA Standard Drawing
                      No. WSUD-001
               ii.    are designed to ensure that flows which exceed the treatment capacity of
                      the device avoid damaging of the filter media or subjecting the filter media
                      to excessive sediment loads
               iii.   are provided with a free-draining outlet from the sub-soil drainage system
          All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
          Sustainable Planning Act 2009.

                                                                                  Page 43 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.