PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
21. Detailed life cycle costing must be prepared for the stormwater quality treatment
system by a Registered Professional Engineer Queensland and submitted to Council
prior to the issue of any Development Permit for Operational Works.Stormwater and
Flood Management
22. Stormwater and flood management for the development must be provided generally
in accordance with the provisions identified for the eastern tributary in the Stormwater
and Flooding prepared by BSM and dated 15 September 2014. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. a non-worsening at the site boundaries
b. certification must be submitted to Council at the completion of works from an
RPEQ which certifies that the development has met the stormwater and
flooding requirements of this Decision Notice
Electricity and Telecommunication Services
23. Underground reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the standards
and requirements of the relevant service provider.
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
26. An easement for inter-allotment drainage must be provided within Lot 11 which
encompasses the constructed drainage structures.
27. An easement for drainage purposes must be registered against the title of proposed
Lot 17 in favour of Council over the land area identified as the eastern portion of
proposed Lot 17 with extents defined as the full frontage to Wilgee Court to the east,
Lot 5 SP266743 to the north, extending along the southern boundary of proposed Lot
13 and the road reserve boundary to the eastern boundary of proposed Lot 100,
along the southern boundary of Lot 100, then perpendicular to the southern boundary
of proposed Lot 17 and returning to Wilgee Court. Draft easement documentation
must be submitted to Council for endorsement.
28. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
29. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site.
Page 44 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.