2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    21.   Detailed life cycle costing must be prepared for the stormwater quality treatment
          system by a Registered Professional Engineer Queensland and submitted to Council
          prior to the issue of any Development Permit for Operational Works.Stormwater and
          Flood Management
    22.   Stormwater and flood management for the development must be provided generally
          in accordance with the provisions identified for the eastern tributary in the Stormwater
          and Flooding prepared by BSM and dated 15 September 2014. The works must be
          undertaken in accordance with an Operational Works approval and must include in
          particular:
          a.    a non-worsening at the site boundaries
          b.    certification must be submitted to Council at the completion of works from an
                RPEQ which certifies that the development has met the stormwater and
                flooding requirements of this Decision Notice
    Electricity and Telecommunication Services
    23.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    24.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    25.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and
          all applicable legislation at the time of construction.
    Easements
    26.   An easement for inter-allotment drainage must be provided within Lot 11 which
          encompasses the constructed drainage structures.
    27.   An easement for drainage purposes must be registered against the title of proposed
          Lot 17 in favour of Council over the land area identified as the eastern portion of
          proposed Lot 17 with extents defined as the full frontage to Wilgee Court to the east,
          Lot 5 SP266743 to the north, extending along the southern boundary of proposed Lot
          13 and the road reserve boundary to the eastern boundary of proposed Lot 100,
          along the southern boundary of Lot 100, then perpendicular to the southern boundary
          of proposed Lot 17 and returning to Wilgee Court. Draft easement documentation
          must be submitted to Council for endorsement.
    28.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    29.   All easements must be designed in accordance with the planning scheme and
          granted at no cost to the Grantee. Where the Grantee is Council or a service
          authority, the easement documentation must be in accordance with the Grantee’s
          standard easement terms. Draft easement documentation must be submitted to
          Council for endorsement.
    30.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
    Earthworks and Retaining Walls
    31.   All fill and associated batters must be undertaken in accordance with an Operational
          Works approval, and contained entirely within the subject site.


                                                                                  Page 44 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.