PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be
fully repaired at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal
Contractor employed to construct the works and a final document will be
required to be submitted at the Pre-Start Meeting for the project.
B. Include the following property note:
REC14/0009 – Gas Pipeline Buffer
The following notation applies to approved lots 10, 11, 12, and 13:
The allotment is within 200 metres of a gas pipeline easement. Enquiries regarding the
future construction and operation of the pipeline should be directed to the gas pipeline
licence holder - APA Group on 33236148 or PO Box 6569, Upper Mt Gravatt, QLD 4122.
REPORT
1. PROPOSAL
The proposal seeks to subdivide 2 lots into 6 lots, being 4 fully serviced residential lots, a park lot
and a balance lot. The residential lots range in size from 701m² to 934m², the Park lot 6043m²
and the balance lot, 1.846ha. The balance lot encompasses 5 further residential lots proposed as
part of a separate application REC14/0008. A small area west of the eastern tributary is also
proposed to be subdivided for residential lots, via application REC13/0146. Both applications are
currently before Council. The lot layout is shown in Figure 1 below and included as
Attachment 1.
Page 46 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.