Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 9 DECEMBER 2014


            b.    maintenance and protection of water quality and existing drainage lines through
                  the construction site, through the implementation of appropriate erosion and
                  sediment control measures
            c.    works programme identifying key components of the works and their respective
                  durations
            d.    establishment of a communication protocol with the general public, adjoining
                  owners, emergency services and local businesses to advise of agreed
                  construction times, impacts on traffic, services and other relevant issues
            e.    identification of complaint management procedures including:
                  i.    contact details for the on-site manager
                  ii.   dispute resolution procedures
            f.    details on the location of external fill sites/sources, the haulage route, type of
                  vehicle to be utilised during filling operations and frequency of usage. NB any
                  damage to the existing road system as a result of haulage operations shall be
                  fully repaired at the applicant’s expense
            g.    it is acknowledged that the preliminary Construction Management Plan will be a
                  draft document requiring finalisation upon appointment of the Principal
                  Contractor employed to construct the works and a final document will be
                  required to be submitted at the Pre-Start Meeting for the project.
B.    Include the following property note:
      REC14/0009 – Gas Pipeline Buffer
      The following notation applies to approved lots 10, 11, 12, and 13:
      The allotment is within 200 metres of a gas pipeline easement. Enquiries regarding the
      future construction and operation of the pipeline should be directed to the gas pipeline
      licence holder - APA Group on 33236148 or PO Box 6569, Upper Mt Gravatt, QLD 4122.



REPORT
1.    PROPOSAL
The proposal seeks to subdivide 2 lots into 6 lots, being 4 fully serviced residential lots, a park lot
and a balance lot. The residential lots range in size from 701m² to 934m², the Park lot 6043m²
and the balance lot, 1.846ha. The balance lot encompasses 5 further residential lots proposed as
part of a separate application REC14/0008. A small area west of the eastern tributary is also
proposed to be subdivided for residential lots, via application REC13/0146. Both applications are
currently before Council. The lot layout is shown in Figure 1 below and included as
Attachment 1.




                                                                                      Page 46 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.