Original source · versioned page text
2014-12-09 Planning & Organisation Committee Agenda
The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014 Figure 1 - Lot layout Access to the lots will be via the new “Masonry Street” cul de sac, a continuation of an unformed stub road off Cordwood Drive. All residential lots are sited on the eastern side of Masonry Street, adjoin existing detached housing lots and have some views across to the park and to the eastern and western tributaries. The majority of the land is flood affected but all residential lots are Q100 immune. Stormwater runoff from all lots drains to the street then is treated within a bio-retention system located in the balance lot, before being released to the eastern tributary. The applicant proposes to rehabilitate a 10m wide corridor for the full length and both sides of the waterway. A footpath is proposed from the end of the cul de sac across the eastern tributary, connecting to the adjoining proposed parkland which is part of a separate subdivision application REC13/0146. A foot bridge proposed across the waterway within the park lot (Lot 100) is also forms part of the stormwater detention strategy. The applicant seeks to off-set the Park Infrastructure Contribution of this development by providing a playground on adjoining land subject to development application REC13/0146 as provided for under the Sustainable Planning Act 2009. An Infrastructure Agreement is proposed to secure the playground in lieu of the Park Contribution. Page 47 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.