PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
b. If used, personal names should commemorate persons who have contributed
significantly to the development of the region; demonstrated outstanding levels
of civic service; or achieved role-model status in the wider community or
donated property or funds for community benefit; and be recognised in
memoriam;
c. Park names should be unique within the locality;
d. Approval will not be given to a name that may construed as advertising, is more
than one word, understanding that a geographic relationship such as Cooroy
Mountain is permissible; is insensitive to diverse cultures and does not accord
with community standards; and is not concise, easy to pronounce and spell and
be without accent marks, apostrophes or hyphens.
7. All street signs on new roads (public and private) and parks must be erected prior to
works being accepted on maintenance.
Boundary Encroachments
8. Certification must be submitted to Council from a Licensed Surveyor which certifies
that:
a. all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
easement
b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included
within an easement
c. all retaining walls and structures are fully contained within the lot they retain
d. any fill, including fill batters, are wholly contained within the subject site and not
on adjacent properties
Water & Sewer Connections
9. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
10. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
Performance Bond
11. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Landscaping & Ecology
12. Landscaping and rehabilitation works must be undertaken in accordance with an
Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping
Plants and Guidelines. An ecological rehabilitation and landscaping plan must be
submitted, prepared by a suitably qualified person* and must include in particular:
Page 5 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.