PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
a. Western Tributary - the area to be rehabilitated must be generally 10m from the
top of bank of the western tributary and the whole of The Noosa Plan’s mapped
Riparian Buffer area to the western side of the western tributary.
b. Eastern Tributary - the area to be rehabilitated must be generally in accordance
with the approved Revegetation & Rehabilitation Management Plan – Eastern
Tributary Stage 5 & 6
c. details of the treatment to all batters, armoury, plantings, weed treatment,
location of services/utilities and rehabilitation.
d. a maintenance period of no less than 3 years
e. a species palette and densities table incorporating the species selection of only
native indigenous species
f. measurable and achievable criteria on which the performance of the floristic
and structural component of the re-vegetation strategy can be assessed
annually over three years, including no weeds at the end of the re-vegetation
period
g. provision of 1 street tree with a minimum pot size of 100 litres planted within the
road reserve for every 8 metres of road frontage including around the cul de
sac’s
h. control of all weeds species listed in the following standards and legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other plants
identified in writing by Council (*refer to Advisory Note)
13. All rehabilitation and re-vegetation of the eastern tributary (waterway) must be
completed prior to Council endorsement of the Plan of Survey.
Dedication of Land as Reserve
14. The area identified as lot 100 Park must be dedicated to the Crown as a reserve for
Park purposes. The land to be dedicated is “non-trunk infrastructure” for the purposes
of the Sustainable Planning Act 2009.
Active Park
15. Active park embellishments must be provided generally in accordance with drawing
number 14/005-S01, titled Erindale Park, Cooroy Proposed Park Land Development
Concept Plan, prepared by Play Environment Consulting dated 13.05.14 and 14/005-
S01 and 14/005-S02, titled Erindale Park, Cooroy Proposed Park Land Development
Concept Plan, prepared by Play Environment Consulting dated 17.11.14. All works to
be dedicated are “non-trunk infrastructure” for the purposes of the Sustainable
Planning Act 2009.
Works within Protected Land
16. The following works must be undertaken within the land to be dedicated to the Crown
as Park reserve:
a. footbridge and pathway
b. All rehabilitation and re-vegetation of the eastern and western tributaries
(watercourses)
c. Active Park embellishments in accordance with this Decision Notice.
All works must be undertaken in accordance with an Operational Works approval.
Page 6 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.