Skip to the record
Accept no substitutions.

Original source · versioned page text

2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     9 DECEMBER 2014



    Issues                                       Comments

    Loss of native fauna habitat.                The proposal requires the clearing of 3 trees within the
                                                 mapped riparian buffer area of the Biodiversity Overlay
                                                 for the creation of the bioretention basin.
                                                 A condition is required for the 750m 2 of drainage and
                                                 environmental park area adjacent to the waterway to be
                                                 rehabilitated and revegetated, providing a vegetated
                                                 corridor through the development. This rehabilitation
                                                 offsets the removal of the trees for the basin.
                                                 The balance of the site is not mapped as either
                                                 Environmental     Enhancement  or  Environmental
                                                 Protection vegetation.

    Potential stormwater impacts on 154 Elm St   The site is to be regraded to drain to the new road and
                                                 the preliminary stormwater design includes inter-lot
                                                 drainage servicing 154 Elm Street.

5.       CONCLUSION
In deciding whether to issue a Preliminary Approval to develop detached houses on the 2ha
Community Service zoned land in Cooroy, there must be sufficient grounds in the public’s
interest to allow for the development.
The applicant has not provided a detailed need analysis to justify the loss of the Community
Service zoned land. Despite this, there are reasonable grounds due to the site’s access
constraints, the location away from the Business Centre and the adjoining residential zones.
Further, since zoning the site for Community Services in 2007, there have been other significant
development approvals for Retirement & Special Needs Housing in the immediate area. These
are likely to meet the need for this residential use for the next 20 year planning horizon.
The proposed development for detached housing is within the existing urban footprint and
provides for a practical infill development within an already established and planned residential
area of Cooroy. While the proposed use raises a conflict with the Cooroy and Lake Macdonald
Locality Code, it is considered that the following grounds are sufficient to support the proposal:
1.   The development provides for a practical infill development to support a growing urban
     settlement of permanent residents in Cooroy.
2.   The proposal is compatible with the residential zoned land surrounding the site.
3.   The proposed residential uses are compatible with the constrained site access provided via
     Blue Wren Place, with more intensive development unlikely to be suitable.
4.   The use of the site for residential uses will not unduly impact Cooroy’s ability to provide for
     a range of community uses.
The application is therefore recommended for approval, subject to conditions.

Departments/Sections Consulted:
x     Community Services                         x   Planning & Infrastructure
      Disaster Management & Public Order         x   Building & Plumbing Services
      Waste & Environmental Health               x   DA Planning
x     Community Facilities                       x   Strategic Land Use Planning
      Cultural Facilities                        x   Asset Design & Investigations
                                                     Asset Planning
                                                     Civil Operations
                                                     Environment
                                                 x
      Executive Office                               Corporate Services




                                                                                        Page 77 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.