PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
26. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
27. Easements for inter-allotment drainage within Lots 26-28 which encompass the
constructed drainage structures.
28. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
29. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
32. Reticulated water must be provided to each lot in the development. This must
include:
a. Ensuring that internal water pipes are wholly contained within the lot they will
serve.
b. An approved water meter for each lot in accordance with Unitywater and SEQ
Standard Drawings.
c. Provision of a water service from the existing 100mm diameter water main to
service located in Blue Wren Place to service each lot within the proposed
subdivision in accordance with Unitywater and SEQ Standard Drawings.
d. Water meters must be located on alternative boundaries to electrical pillars
e. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second
33. Reticulated sewerage must be provided to each lot in the development. This must
include:
a. Ensuring sewer house drains are wholly contained within the Lot they will serve.
b. Provision of sewerage infrastructure to within the property boundaries of each
Lot within the proposed subdivision.
Page 9 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.