2014-12-09 Planning & Organisation Committee Agenda

of 134

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             9 DECEMBER 2014


    Stormwater Drainage.
    20.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval, and must include in particular:
          a.   the drainage structures generally as shown on the Approved Plans
          b.   the provision of Level 2 inter-allotment drainage for proposed Lots 26-28
               including registration of drainage easements
          c.   provision of kerb adapters for all new lots that discharge into the new road
          d.   extension of the site stormwater system to accommodate stormwater from
               applicable areas external to the site, including registration of drainage
               easements
          e.   a maintenance path to any proposed bioretention basin that is suitable for
               Council’s maintenance vehicles
    21.   A stormwater quality treatment system must be provided for the development. The
          works must be undertaken in accordance with an Operational Works approval and
          the Bioretention Technical Design Guidelines (Water by Design) and must include in
          particular:
          a.   stormwater quality treatment devices generally in accordance with the
               Approved Plans
          b.   bioretention devices which:
               i.     are designed generally in accordance with IPWEQA Standard Drawing
                      No. WSUD-001
               ii.    are designed to ensure that flows which exceed the treatment capacity of
                      the device avoid damaging of the filter media or subjecting the filter media
                      to excessive sediment loads
               iii.   are provided with a free-draining outlet from the sub-soil drainage system
    22.   Where bio-retention devices (or similar) are required within a residential allotment the
          devices:
          a.   must be installed prior to the sealing of the Survey Plan
          b.   must be protected by a covenant.
          c.   a maintenance handbook, able to be provided to future owners, must be
               prepared for the system to outline how the system works and the level of
               maintenance that will be regularly required. The maintenance handbook must
               be submitted to Council for approval and for records purposes prior to the
               sealing of the Survey Plan.
    23.  Detailed life cycle costing must be prepared for the stormwater quality treatment
         system by a Registered Professional Engineer Queensland and submitted to Council
         prior to the issue of any Development Permit for Operational Works.Electricity and
    Telecommunication Services
    24.   Underground reticulated electricity and telecommunication services must be provided
          to each lot in accordance with an approval for Operational Works and the standards
          and requirements of the relevant service provider.
    25.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.


                                                                                   Page 8 of 134
Log in to download the original file

2014-12-09 Planning & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.