PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
Street Identification
8. The street address of the development must be clearly visible and discernible from
the frontage of the site by the provision of a street number and, where appropriate,
the building name.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to commencement of operational works associated with the
development. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with condition.
CIVIL ENGINEERING
External Works
10. That part of the Lake Macdonald Drive frontage of the site extending from the existing
culvert adjacent to “Gate 2” to a point approximately 85 metres to the south west
must be upgraded. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. linemarking to clearly indicate a left turn lane for vehicles accessing the site
b. road widening to provide for the left turn lane (where necessary)
c. reconstruction of the existing table drain to ensure that the road formation is
free draining
d. the reshaping of the verge to ensure that sediment is not transported onto the
road formation.
Site Access and Driveways
11. Sealed access driveways must be provided from Lake Macdonald Drive to all parking
and manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. a driveway crossover generally in accordance with IPWEAQ standard drawing
SEQ R-051
b. a driveway width sufficient to cater for regular use by a HRV and the occasional
use by a semi-trailer (AV)
c. all damaged sections of the existing hardstand driveway must be replaced with
a suitable similar surface
Car Parking
12. A minimum of 64 car parking spaces must be provided and marked on the site. The
spaces must be available and accessible at all times while the use is open for
business. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. 44 staff parking spaces within the total, which are clearly marked for that
purpose
b. 20 visitor/customer parking spaces within the total, which are clearly marked for
that purpose and accessible at all times for visitor/customer use
c. 2 disabled parking space/s within the total
d. a sealed surface with crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities
Page 94 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.