PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
13. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Bicycle Parking & End of Trip Facilities
14. Bicycle facilities in accordance with AS2890.3 Bicycle Parking Facilities must be
provided for the development. The facilities must be indicated on the plans and
submitted in accordance with an Operational Works approval and must include in
particular:
a. a total of 10 bicycle parking spaces
b. end of trip facilities involving a minimum of 5 lockers and 1 shower cubicle with
an ancillary change room.
Damage to Services and Assets
15. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
c. Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
Stormwater Drainage
16. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval, the Queensland Urban Drainage Manual and Engineering report
dated 3 September 2013 by Barlow Shelly Consulting Engineers (with the works
expanded to reflect the extended development area).
Stormwater Quality Management
17. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in section 5.0 and 6.0 of the of the Engineering
report dated 3 September 2013 by Barlow Shelly Consulting Engineers (with
the works expanded to reflect the extended development area)
b. swales which are designed in accordance with the Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland
c. The works must be undertaken in accordance with the Bioretention Technical
Design Guidelines (Water by Design, 2012)
18. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
approved Operational Works drawings for the stormwater quality treatment system
and detailed life cycle costing of the system must be attached as an addendum to this
document. Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
Page 95 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.