Original source · versioned page text
2014-12-09 Planning & Organisation Committee Agenda
The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 9 DECEMBER 2014
ENVIRONMENTAL HEALTH
Refuse Management
23. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
and Industrial Premises”, including an external imperviously paved area correctly
sized for all refuse and recycling containers and suitably screened from public places
and neighbouring properties. A bin wash area is required with a cold-water tap, hose
and drain outlet connected to the effluent disposal system, via a bucket trap. The
drain outlet is to be designed to prevent storm water entry to the effluent system and
this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide
(max 0.5m²), or alternatively the waste area can be roofed, or any other design
approved by Council’s delegate.
24. The development must allow refuse-loading areas to be located off street. All
vehicles associated with the collection of waste/recyclables, shall enter and leave the
site in a forward direction.
25. A Waste Management Plan (Operational) in accordance with Planning Scheme
Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
Premises”, shall be developed and implemented on site. The Waste Management
Plan must include the following as a minimum: -
The types and estimated volumes of waste that will be generated from the
activities approved within the development.
Methods to be used for dealing with garden waste.
Initiatives to minimise waste either by waste prevention, reduction, re-use or
recycling.
Description of procedures and clearly identified site responsibilities for all site
occupants for getting all waste to the bins; the storage of bins and the collection
of bins by the contractor.
A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing and
system to prevent storm water getting into the effluent system via the bin wash.
A description of types and volume of waste storage containers to be used, and
the collection frequency of containers,
The waste and recycling storage area shall include the provision of containers
for all waste and recycling materials including putrescible matter, non-recycling
waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, Styrofoam
boxes, etc.
Effluent Disposal
26. All factory wastewater and wash down waters shall be collected, treated and
disposed of lawfully on site in an approved effluent disposal system.
PLUMBING
Plumbing, Drainage and Waste Water Treatment and Disposal
27. The development must be provided with Plumbing, Drainage and an On-site Waste
Water Treatment and Effluent Disposal System having a capacity sufficient for the
use*.
*(Refer to Advisory Note)
Page 97 of 134
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.