Council archive · source document
132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05) · 132005.699.04
132005.699.5
DA 19 P Stage 3A - Emerald - Level 4 Floorplan 20 October 2010
DA 20 P Stage 3A - Emerald - Elevations 1 20 October 2010
DA 21 P Stage 3A - Emerald - Elevations 2 20 October 2010
and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
3. The open space and setback areas within the area of the site able to be developed
excluding the area of the site included in the Retained & Enhanced Vegetation, are to be
landscaped in accordance with Council's Policy on Landscaping Guidelines and a
properly prepared landscape plan. Such landscaping is to be completed prior to the
premises being occupied and maintained at all times thereafter and shall include:
3.1 retention of existing trees within the side and front setback areas, except where
their removal would be necessary as a result of approved building or operational
works;
3.2 retention of existing trees between the building and the area of the site identified
as Open Space Conservation & Waterway on Drawing No. 881228/E, titled 'Metes
& Bounds Plan for Private Open Space for Conservation and Waterways
Protection on Residential High Density (RHD) and dated 30 June 2004, except
where their removal would be necessary as a result of approved building or
operational works or the requirements of the Bushfire Management Plan;
3.3 incorporation of koala and glossy black cockatoo food trees; and
3.4 mature planting, including a minimum of 3 x 100 litre native trees and 20 x 45 litre
native trees.
4. The Eucalyptus tereticornis trees and their surrounding native vegetation on the area of
Lot 5 (Development Approval 23118 DA) shall not be cleared until at least 25 Eucalyptus
tereticornis trees have been planted, are well established and attained 3 metres in
height, in the Private Open Space for Conservation & Waterways Protection area on Lot
5. These works shall be undertaken pursuant to the Environmental Management Plan
(EMP1) prepared by WBM Oceanics Australia and dated 25 July 2005 and the
Ecological Restoration Plan & Specifications prepared by C&B Group and dated May
2005.
5. An easement in favour of the general public shall be provided over the pathway
proposed along the site's southern boundary and through the Private Open Space for
Conservation & Waterways Protection Area as shown on drawing No. 0215.5-6.SK04A
prepared by Stephen Kidd Design, or alternatively, as shown on drawing no. DA 03
Revision P prepared by Cape Bouvard Pty Ltd and dated 20 October 2010. The
pathway shall be constructed to provide for pedestrian access for the general public
during daylight hours 7am to 7pm, 7 days a week and shall be constructed in
accordance with the approved Management Plans for the site.
6. Any fencing provided in conjunction with the development is to be setback at least 1
metre from the road frontage with at least half of any fence setback 2 metres. Dense
landscaping is to be provided between the road frontage and any fencing.
7. The visitor parking spaces at the frontage of the site shall be set back a minimum of
2 metres from the front boundary to allow for soft landscaping to be established.
8. The rooftop terraces shall not be covered, with any fixed structure or the like.
Page 3 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05)Related documentApplication case desk ↗
132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05)Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file