22.2 Stripping of vegetation for construction purposes should be minimised. If
vegetation is destroyed it should be reinstated immediately after construction is
completed;
22.3 Additional load due to fill, construction equipment or stockpiled materials should
not be located on the dune slope;
22.4 Vibration monitoring is to be carried out by the geotechnical engineer and
appropriate action taken should vibration effects be a concern.
22.5 A RPEQ is to be engaged by the client to oversee the piling works.
22.6 The construction of the whole of the foundations is to be carried out in accordance
with the recommendations of the applicant's consulting Geotechnical engineer,
including any on-site supervision required by these recommendations. Such
works shall only be carried out during dry weather conditions and if there is a risk
of sand movement occurring, all work shall be suspended until such steps,
approved by the applicant's consulting Geotechnical engineer have been
undertaken to ensure that no further slippage will result.
Land Development
23. All relevant conditions of Development Permit 23118 DA shall be complied with prior to
the use approved under this permit (2005/0699) commencing.
Lot Amalgamation
24. Deleted.
Vehicle Access
25. A 6.0 metre wide concrete crossover driveway shall be constructed from Serenity Close
generally in accordance with Council's Standard Drawing SEQ R-051.
26. The driveway shall be designed and constructed to Council's design standards and to
grades that prevent vehicles from scraping and/or bottoming whilst also allowing
pedestrians movements along the footpath without any level difference. Should any
driveways be constructed to grades that do not comply with Council's Standards or
AS/NZS 2890.1-2004.
Council will require that the driveway be removed and reconstructed to levels that do
comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is
preferred to have the footpath continue at a constant grade to minimise the potential for
pedestrians to trip or fall.
27. All vehicles shall enter and leave the site in a forward direction.
28. Full engineering details of the proposed driveway and carparking area shall be
submitted for approval prior to obtaining a Development Permit for Operational Works.
Internal Driveways
29. The development shall have an internal driveway that complies with the width and grade
requirements as set out in AS/NZ2890.1-2004.
Service Bay
30. A shared service bay for small delivery/maintenance vehicles and visitor parking shall be
made available on site. This space shall be clearly line-marked and sign posted for use
by Service Vehicles between the hours of 6am to 6pm. Outside of the specified hours
the space could be used as a standard visitor space.
Page 5 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05)Related documentApplication case desk ↗
132005.699.1.05 - Application to Change to Existing Approval - (shows as 699.1.05 but should be .66.05)Related documentApplication case desk ↗
About this file
- File size
- 4.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.