SUPERSEDED 2009/1058 - Change to Existing Approval [As Published] · 132009.1058.02
2009/1058
35. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the
site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s
kerb & channel drainage system in Piper Street or discharged via on-site infiltration pits. Plans
of the drainage design must be prepared and certified by a Registered Professional Civil
Engineer and submitted for Building Works Approval.
1.The maximum discharge of stormwater drainage allowable to Council’s kerb & channel
street drainage system at any one location is 25 litres/second.
2.The stormwater drainage design must ensure that no ponding or scour occurs on the subject
site or on neighbouring properties.
36. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
37. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
38. The applicant is advised that this approval does not relate to sewer main setbacks within the
site or adjacent to the site, as a Building Certifier will assess this during the Building
Application process and after consultation with Council’s Water & Sewerage section. Should
any Council sewer mains be affected as a result of non-compliance with this condition, the
Building Certifier will be held personally liable. To this end, all Building Applications will need
a site plan prepared & certified by a licensed surveyor clearly illustrating the exact location of
any sewer mains and the ‘zone of influence’ of these mains.
Town Water Supply
39. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
40. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
Earthworks
41. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Building Works
approval.
42. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Site Stability
43. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development and recommend
any measures to prevent slumping during excavations. The recommendations of this report
shall be incorporated into the design and construction of the proposed development.
Erosion and Sediment Control
44. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
Page 6 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED 2009/1058 - Change to Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.