Council archive · source document
0016516F.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
Table L
: ; QLeave Project Number
Amount paid Date paid (6 digits, starting with A, B, E, Lor P)
a QO
OFFICE USE ONLY
Datereceived | | Referencernumbers |
FOR COMPLETION BY ASSESSMENT MANAGER
ls a QLeave Notification and Payment Form required for this application?
[] No
{_] Yes — Complete Table M
@ Table M
, . , Date receipted form
Description of the work Amount paid } bate paid QLeave Project Number sighted by assessment | Nameofofficer who
: . ($) manager sighted the form
Pep
NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
| have been engaged as the private certifier for the building work referred to in this application.
esAcatteain nner | aig dein
Advice for completing Part A
© General advice
e Under IPA, section 3.2.1(7} mandatory requirements must be correctly completed for a development application to be a ‘properly made application’.
The assessment manger may refuse to receive an application that is not properly made.
« Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of
applications, are stated in other Parts of Form 1.
e The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only.
« — For further information about completing this form go to IDAS Guide 1 (Making and IDAS apnptication}
Qt « The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the local government.
e The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether ar not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
« A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA) only.
Instead complete Q1(a).
¢ Strategic Port Land is within a local government area but a local government's planning scheme does not apply on Strategic Port Land.
Strategic Port Land is declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development
on strategic port land) and the Queensland Transport (Ports) website.
« Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application.
e Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.
-5-See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0016516F.001.pdfRelated documentPublic source context ↗
07/1894 - Op Works - Acess, Frontage, S&E, Stormwater [As Published]Related documentApplication case desk ↗
About this file
- File size
- 594 KB (small file)
- File type
No other editions are linked here.