Skip to the record
The only place to find full transcripts.

Council archive · source document

0016516F.001

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                                      Part A, Version 3.0, 3 September 2007
                   Q3          «  Asingle development application may involve land both within and outside waters.
                               «  A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
                                  which high spring tide ordinarily floes and reflows (unless a regulation has declared a limit for the watercourse). Generally, a watercourse
                                   is in the jurisdiction of the Department of Natural Resources and Water.
                               *   ‘Tidal water’ is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is
                                  defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to high
                                  water mark at spring tides) establishes the boundary of a tidal area.
                               «   Land below high water mark is not within a local govemment's area unless provided for under the Local Government Act 1993. Unless
                                   otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic port land is
                                   within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a local
                                   goverment tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal
                                   works within the tidal area for a local government, and the planning scheme may be applied to that assessment (to the extent provided
                                   for in the code for prescribed tidal work).
                               «   The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
                                   Form 1 Application Form (including this Part and any other relevant Part) is correct.
                               e   If the applicant is a company or organisation, a contact person must be nominated.
                               »   Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
       @                           Manager, during the processes of the application or in the event of an appeal about the outcome of the application.
                               «  Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
                                  Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where
                                  evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Requiation
                               ¢  Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence.
                               e   Evidence may be required from more than one Department responsible for a State-owned resource, e.g, from the Environmental
                                   Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
                                   State-owned land above high water mark..
                               ¢   Inthe case of applications involving the taking or interfering with water under the Water Act, the development application may be
                                   made at the same time as the request for resource entitlement.
                               «   Inthe case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or
                                   encroachment (identified by gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to
                                   the Department of Main Roads.
                   Q11         ¢  Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
                                   application involves any of the following:
                                  (i)  amaterial change of use;
                                  (ii) reconfiguration of a lot;
                                  (iii) work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management Act 1995; or
                                  (iv) work on rail corridor land defined under the Transport Infrastructure Act 1994.
                               »  ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
                                   receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
       ©                       «  Owner's consent is not required for a mobile and temporary ERA.
                    Q13        «  The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the
                                  building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To
                                  fund the scheme, a levy is collected on all building and construction work carried out in Queensland where the total cost of the work,
                                  whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for calculating
                                  the levy are stated in the Building and Construction industry (Portable Long Service Leave) Regulation 2002. Included in the amount
                                  collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction Industry Training Levy.
                               «  The Building and Construction industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction industry
                                  for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining or repairing
                                  buitdings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.
                               e  The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a development
                                  permit for certain building or operational work. The assessment manager must sight an approved form issued by QLeave advising of the
                                  status of the payment of the levy.
                               «  Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or agency, on request
                                  from QLeave, or can be completed on the QLeave website at www. qleave.qid.gov.au
                               «   For further information contact QLeave (Tel: 1800 803 481 Web: www.qleave.gid.qov.au )

                   Privacy Statement
                         The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in accordance
                         with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS
                         process, except where required by legislation (including the Freedom of Information Act 1992) or as required by Parliament. This
                         information may  be stored in a Department of Local Government, Planning, Sport and Recreation database. The information collected will
                         be retained as required by the Public Records Act 2002. For further information on your privacy, contact the Privacy Contact Officer for
                         the Department of Local Government, Planning, Sport and Recreation at (07) 3237 1860.
                                                                                           -6-

a

Used in these records

About this file

File size
594 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0016516F.001.pdf · 594 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.