Installation Guide - Load Support _v2021.3a
Grading and Compaction
Grading and Compaction
Grading and compaction should be carried out according to
standard procedures and in full compliance with the project
specifications. The following are key points.
NOTE: Full compaction is critical to the performance of
the Neoloy load support mechanism. Do not use heavier
compaction equipment than is necessary, as this may
cause “waves” in the surface that prevent full
compaction.
1. Before Starting:
a) To ensure full compaction, determine the correct
type of equipment before starting the project.
b) Verify that there are no large pieces of debris, soil or FIGURE 19. GRADING
rock that may damage cells.
2. If total fill layers exceed 20 cm, compact separately
(depending upon the type of infill, site and application):
a) First compact Neoloy infill layer.
b) Then compact cover layer.
3. Do not leave any Neoloy Tough-Cell wall exposed. Verify
that overfill is at least 2 cm above cell height after
compaction.
4. Water spray trucks may be used to suppress dust, if
required.
5. Shape compacted surface to required elevation and grade FIGURE 20. COMPACTION
with conventional graders and compactors.
PRS-EN-TD-LS-3000 14/21 Ver. 2021.3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Installation Guide - Load Support _v2021.3a.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.