ORDINARY MEETING MINUTES 20 AUGUST 2020
8. Dwellings and outbuildings are to be located within the building envelopes provided for
the proposed lots consistent with Plan of Development, Drawing No. 7623-SK100,
Revision F prepared by TOD Engineers and Project Managers, dated 6 August 2020.
9. Dwellings must not exceed a maximum building height of 9 metres measured from the
natural ground level as defined by the Noosa Plan 2006.
10. The Body Corporate is responsible for maintaining the access to the proposed lots in
accordance with the Plan of Development, Drawing No. 7623-SK100, Revision F
prepared by TOD Engineers and Project Managers, dated 6 August 2020.
Onsite Civil Works
11. Prior to sealing of the plan of survey, proposed Lots 1, 2 & 4 are to be filled to provide
suitable building pads and access in accordance with the Plan of Development, Drawing
No. 7623-SK100, Revision F prepared by TOD Engineers and Project Managers, dated
6 August 2020. The works required are to be in accordance with the following:
a) the building pad on proposed Lot 4 is to be located not less than 4m from the
southern boundary;
b) the building pads within proposed Lots 1, 2 & 4 are to achieve a minimum reduced
level of RL 2.600m (AHD) and battered down to natural ground;
c) the access driveway from Lake Weyba Drive to each of the proposed lots is to be
constructed in accordance with the Plan of Development, Drawing No. 7623-
SK100, Revision F prepared by TOD Engineers and Project Managers, dated 6
August 2020, including the provision of 5.5m wide passing bays as shown;
d) the access driveway is to achieve a minimum reduced level of RL 1.5m (AHD);
e) roadside flood height gauge boards are to be installed within the common property
to indicate depth of floodwaters to residents and occupiers of the site in metres
(AHD);
f) the filling works undertaken for the raised building pads and access driveways shall
be designed to prevent ponding within the proposed lots and on adjacent
properties;
g) all civil works within the site are to be certified by a Registered Professional
Engineer of Queensland (RPEQ).
Flood Emergency Management Plan
12. The Applicant is to notify all prospective purchasers of the proposed lots that the site is
subject to flooding hazard and provide them with a copy of the Flood Emergency
Management Plan (FEMP) dated 27 February 2020 prepared by Water Technology.
13. The FEMP (and associated procedures) must be complied with at all times. The Body
Corporate and the owners of the proposed lots, including successive landowners, are
responsible for implementing the FEMP.
14. All owners and occupiers of the proposed lots, including successive landowners, are to
be provided with a copy of the FEMP (and procedures for the purposes of implementing
the FEMP), for which the Body Corporate is responsible.
15. The Body Corporate is responsible for maintaining and providing suitable information
packs/kits to all owners and occupiers of the proposed lots. The information packs must
include details in relation to the flooding hazard, the FEMP and emergency flood
procedures. A copy of the information packs/kits must be submitted to Council prior to
the sealing of the survey plan.
16. The Applicant and the owners of the proposed lots are not permitted to undertake works
within the proposed lots that would undermine the operation and implementation of the
FEMP.
Page 12 of 16