RFI 9.3.20 - L05 response to IR · OPW19/0082
Page 2
Item 4: Provide additional comment and plans to clearly define:
4.1. The entry/exit and traffic direction for vehicle accessing the main carparking area,
4.2. The width and passing opportunities for vehicles travelling past the main carpark
to access Stage 1b
4.3. The width of the formation of the 2 way section of driveway between Lake
Cooroibah Road and the entry/exit of the main carparking area. Please note that 2 way
sections must be a minimum of 5.5m wide.
4.4. Additional detail on the formation/width of the proposed pathways and the intended
timing of the works
Applicant’s Response to Item 4: Please refer to Attachment B which provides revised engineering
plans prepared by Lindsey Consulting that address the above item. The revised engineering plans detail
all works contained within Lot 2.
Item 5: Provide additional comment and plans that clearly describe the formation of the
proposed carparking area and includes dimensions of aisles, spaces etc.
Applicant’s Response to Item 5: Please refer to Attachment B which provides revised engineering
plans prepared by Lindsey Consulting that address the above item.
Item 6: Provide sufficient detail to demonstrate how the proposed carparking area achieves
compliance with conditions of the approval.
Applicant’s Response to Item 6: Please refer to Attachment B which provides revised engineering
plans prepared by Lindsey Consulting that address the above item.
Item 7: Provide written authority from the owner of the property (either Lot GTP1928 or the
body corporate for GTP1928) in which the discharge point is located.
Applicant’s Response to Item 7: The proposed stormwater discharge point has been relocated and
is now located within Lot 2. The adjoining owners consent is therefore not required.
Item 8: Provide amended plans that indicate the floor levels that are in accordance with the
most recent version of the higher order approval.
Applicant’s Response to Item 8: Floor levels for all tents and the managers residence are detailed at
RL3.2 metres.
Item 9: Provide an amended landscape plan that details the requirement of the bushfire management
plan.
Applicant’s Response to Item 9: Please refer to Attachment C which provides a revised landscape
plan prepared by Earth Creation Landscapes that address the above item.
Item 10: Provide an appraisal of the effluent disposal system(s) to be utilised to ensure
fluctuations in usage and disposal impacts on vegetation and ground water area are managed.
Applicant’s Response to Item 10: Please refer to Attachment B which provides a plan of the effluent
disposal system prepared by Lindsey Consulting Engineers.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI 9.3.20 - L05 response to IR.pdfRelated documentApplication case desk ↗
About this file
- File size
- 330 KB (small file)
- File type
No other editions are linked here.