Attachment 7 - Energex Consent

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                                                 6




   At all times the following clearance must be maintained from the top of any machinery
    moving in the vicinity of energised conductors:

                   132kV and 110kV conductors – 4.5m minimum clearance
       Should it be necessary to transport equipment or extend any equipment, such that
       these clearances cannot be confidently maintained, you are required to contact our
       office to ascertain whether a Safety Officer is required on–site. All operators of
       machinery are to be made aware of the presence of high voltage conductors.

   All easement conditions must be maintained

   All previous conditions must be adhered to and Energex may, at its discretion, audit
    the finished development to check that it conforms to the conditions of the
    development.

   Detailed civil design drawings showing any proposed cut and fill levels on the
    easement and the location of the Energex assets in relation to the proposed
    development must be approved by Energex before any works can commence on
    site.




Reference: HBD 6804682

                          Did you know Energex has a referral website?
     https://www.energex.com.au/home/our-services/connections/development-application-referrals
Log in to download the original file

Attachment 7 - Energex Consent.pdf · 273 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.