PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 FEBRUARY 2020
Summary of Matters Raised Comments
Consider 5G antennas – people not wanting to The proposal does not indicate that 5G will operate
come within close proximity or live near them. from this site. If approved, the infrastructure could
be upgraded to include any new technology in the
future.
Property values will be affected due to the visual It is acknowledged that this is an issue for residents.
impact. Further, a tower in close proximity to The Planning Act 2016 states that a planning
dwellings will cause devaluation with no right to scheme is not to include matters concerning a
compensation. person’s financial circumstances in the assessment
benchmark. Further, impact assessment may be
carried out against, or have regard to, any other
relevant matter, other than a person’s personal
circumstances, financial or otherwise. The
submitters concerns are nevertheless noted
Concerns that the applicant’s consultant has The applicant’s consultant had a public meeting for
been evasive eg. advertising in Gympie Times, public consultation in Pomona, rather than in the
public meeting in Pomona, when development is Cooran township. Some Cooran residents believe
in Cooran. that this was to avoid feedback. The applicant’s
The consultation process was flawed due to the consultant provided reasoning that there was not a
lack of proper notice given to those directly suitable site available in Cooran at the time of the
affected by the proposal. Advertising was public meeting, resulting in the meeting being held
limited to a Gympie newspaper and not the in Pomona.
Noosa News, which is circulated in the Cooran Under the Planning Act 2016, public notice
locality. requirements include the publishing of a notice ‘in a
newspaper circulating generally in the locality of the
There has been no contact by them to
premises the subject of the application’. The
understand impacts, even when asked for a call
applicant’s consultant provided Council with
back. Some owners tried to contact the applicant
evidence that the circulation of the Gympie Times
to discuss visual impacts, but messages left for
includes the town of Cooran. Refer Figure 20–
the applicant’s consultant were unanswered.
Newspaper Circulation Area below
Letters sent to people within the catchment from
It is noted that some residents may have mistaken
applicant’s consultant that looked like junk mail
communication from the applicant’s consultant as
– addressed to ‘The Occupier’.
junk mail.
If it has to be placed in the Cooran region, The applicant maintains that the existing tower on
position it alongside the existing tower or replace Tablelands Rd cannot be upgraded to obtain the
this (across the road from proposed tower), or coverage NBN are seeking and would need to be
position it where the visual impact is not so replaced with a stronger, lattice style structure up to
great. The existing tower does not protrude the 50m in height. At this height the structure would
trees and is discrete. protrude above the tree line and be almost twice the
height of the existing Telstra tower.
The applicant maintains that this is cost prohibitive
and the phone network would need to be disabled
while construction was occurring.
The applicant also maintains that even if the existing
Telstra tower at its current height was certified to be
able to carry the extra weight of equipment, the
available height for the NBN equipment would be
20m above ground which the applicant maintains is
too low to be able to get the coverage needed for the
area required to be serviced.
Any tower approved will be able to be upgraded The proposed tower is considered a ‘high impact
which will add to the approved (by Council) facility’ under the provisions of the
height. Telecommunications Act, which requires Council
approval. Upgrades can be made to an approved
facility if they are enabled under the guidelines the
‘Determination (low impact facility)’ which includes,
Page 30 of 119
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.