NOOSA COUNCIL IDAS Development Application Decision Notice                                                    4 of 9


13.   This Development Permit lapses if the development has not happened by 6 August 2009, unless
      application to extend the currency is approved by Council.

Land Development (frontage works, access, car parking, stormwater disposal, sediment and erosion controls)

14.   The development shall be carried out in accordance with Engineering drawings Nos.

             27973-TC1B dated 17/07/07                   by Rienmac Pty Ltd

             27973-C1C               dated 18/06/07             by Rienmac Pty Ltd

             1740-0-1A               dated 15/06/07             by Construction Hydraulic

             1740-0-2                dated 11/05/07             by Construction Hydraulic

             or as modified herein

15.   Roof and surface runoff connection to Council’s drainage system shall be generally as shown on drawing
      No. 1740-0-1A dated 15/06/07 by Construction Hydraulic. A manhole with a trafficable lid shall be
      constructed at the proposed junction with Council’s existing drainage system in Elizabeth Street. The
      construction of the manhole and reinstatement works to the road formation shall be undertaken in
      accordance with Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage
      and Earthworks and the current standard drawings. In this regard a revised drainage plan indicating the
      abovementioned changes shall be submitted to Council for approval prior to the pre-start meeting.

16.   The two existing trees (Mango and Tuckeroo) located in the north-eastern corner of the site shall be
      retained and any works carried out on site shall not have an adverse impact upon these trees. The
      proposed stormwater drainage system and associated retaining structures shown on drawing No. 1740-0-
      1A dated 15/06/07 by Construction Hydraulic shall be relocated to ensure the preservation of these trees.
      In this regard a revised drainage plan indicating the abovementioned changes shall be submitted to
      Council for approval prior to works commencing.

17.   The edge of the access driveway shall be setback a minimum of 500mm from the adjacent property
      boundary.

18.   The proposed visitor carspace in the front setback from Elizabeth Street shall be constructed with a
      sealed surface with minimum dimensions of 2.5m wide and 5.4m deep clear of any obstructions.
      Stormwater runoff from the visitor carspace shall be directed to the stormwater drainage system.

19.   A bikeway/footpath 1.5 metres wide shall be constructed across the full frontage of the development. The
      footpath shall have a slip resistant surface. The alignment, of which, shall be determined on site with
      Council’s Construction Technical Officer. The expansion joints in any bikeway/footpath shall be “sawcut”
      not trowel jointed.

20.   Install suitable root barrier where proposed trees are adjacent to paths, pavement etc in accordance with
      Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.

21.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
      first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
      These devices are to remain in place during the civil works and construction phases of the development.
      The location and type of device to be installed shall be established at the “pre start” meeting with
      Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
22.   Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’ notice of
      intention to commence works to arrange a “pre start” meeting regarding the civil works.

23.   The principal contractor must have all the appropriate insurance and public liability documentation to carry
      out the works. The principal contractor is also responsible to ensure that any sub contractors also have
      the appropriate insurance and public liability documentation.

24.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
      signed approved drawings and conditions by the applicant.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@54044421\@[email protected]

Used in these records

About this file

File size
42 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015A787.001.pdf · 42 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.