Original source · versioned page text
ORDINARY MEETING MINUTES 19 FEBRUARY 2026 · 2026-02-19 Ordinary Meeting Minutes
ORDINARY MEETING MINUTES 19 FEBRUARY 2026
1. The use has previously operated from the site and demonstrated that it
does not result in unreasonable impacts on the surrounding area.
2. The existing backpackers was approved based on the site being
specifically identified for the Visitor Accommodation (Type 4 Conventional) use
under the Noosa Plan 2006 which is also reflected in the Noosa Plan 2020
which facilities Short Term Accommodation on the site. The inclusion of a Food
and Drink Outlet associated with this land use is a reasonable and practical
extension of the preferred existing land use.
11.1.3. MCU25/0118 - APPLICATION FOR MATERIAL CHANGE OF USE FOR
MULITIPLE DWELLING - AFFORDABLE RENTAL PREMISES (25 X SMALL
DWELLINGS) AT 64 LAKE MACDONALD DRIVE, COOROY
That Planning & Environment Committee Agenda Item 7.3 be referred to the
General Committee Meeting 16 February 2026 due to the significance of the issue.
11.1.4. PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY –
DECEMBER 2025
That Council note the report by the Development Assessment Manager to the
Planning and Environment Committee Meeting dated 10 February 2026 regarding
applications that have been decided by delegated authority for December 2025 as
provided at Attachment 1 to the Report.
11.1.5. MULTI-YEAR ENVIRONMENT COLLABORATION GRANTS AND
ORGANISATIONAL ALLIANCE GRANTS PROPOSED RESCHEDULE
That Council
A. Note the report by the Environmental Services Manager to the Planning &
Environment Committee dated 10 February 2026 regarding Multi-year
Environment Grants Proposed Reschedule;
B. Delay the advertising and distribution of Multi-year Environmental
Collaboration Grants and Environment Organisation Alliance Grants for 12
months; and
C. Provide a one-year bridging grant to the current MEC and Alliance recipients
based on current milestones and program objectives if appropriate and if
required by the receiving organisation.
11.1.6. CASCADING CLIMATE RISKS FROM CRITICAL INFRASTRUCTURE
FAILURE PROJECT REPORT
That Council
A. Note the report by the Program Lead - Climate Adaptation to the Planning &
Environment Committee Meeting dated 10 February 2026; and
B. Note the priority actions to implement the key findings from the project, as
listed below:
i. Implementation of adaptation and resilience measures for the Local
Disaster Coordination Centre (LDCC) and Noosaville Depot.
ii. Establishment of management solutions that improve corporate
policies, systems and procedures to build resilience to critical
infrastructure failure and cascading climate risks.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original