7.0 LIMITATIONS:

Field Testing Limitations The soil profiles reported in our Log Section should be representative of
the soil conditions over this site. In some cases soil conditions may change dramatically over short
distances, therefore exploration programs may not locate all variations. If site excavations reveal soil
conditions that are different from those shown in the attached log sections we must be immediately
notified. Changes to the site classification and/or footing design may be necessary.

Previous Excavations The recommendations contained in this report have not taken into consideration
the long term effects of any previous, current or potential subsurface excavation mining or potential slope
instability problems. If a slope stability assessment is required for this allotment we can arrange for this to
be done, but that type of report is beyond the scope of our commission and fees in this report... -.-- -

Client Supplied Information In writing this report we have considered all the information supplied to us
by the client. Should the client or his agent have omitted to supply us with relevant information our report
may be irrelevant and / or inappropriate. We do not take responsibility for the consequences in such
cases and we will make an additional charge if as a result, more testing or re-writing of the report is
necessary.

General Recommendations for Builders/Owners:

Underground Services Where structures are built over uncontrolled fill, services will need to be
supported so that settlement of this fill does not cause them damage or cause incorrect alignment.

Plumbing Arrange plumbing fixtures so that the slab and beam penetrations are kept to a minimum
and where necessary sleeved to allow for movement with 40mm thick closed cell polythene or similar
material. Where the penetration is within 150mm of the base of a beam or footing, the depth of this
footing element should be deepened by approximately twice the diameter of the penetration. All plumbing
and drainage must comply with the requirements of the National Plumbing and Drainage Code.

Drainage The ground surrounding the building site must be graded and drained so that water is
shed away from the house area in all directions. Particular attention should be given to all drainage and
plumbing trenches so that they do not introduce water to the foundation soil, and destabilise the footings.
Correct drainage is an essential part of our recommendations and design. If the site is not prepared
correctly, excessive soil moisture may accumulate in some areas, which may lead to wall and/or floor
movements. Roof water should be diverted away for the building as soon as the roof is installed. Where
building delays occur, temporary downpipes may be necessary.

Bracing for Wind Forces Unless noted, we do not detail slab thickenings or pad footings to
conform to wind bracing. Where a bracing wall is to be bolted to a slab, 40mm bottom concrete cover
attained for a radius of 150mm is required around the bolts unless noted by other consultants.

Inspections:

We require 24 hours notice if you require engineers site inspections. Inspections can be booked between
8.30am and 4.30pm Monday to Friday by telephoning 07 5447 5544.

Site Classification: The site classification is calculated in accordance with the "AS2870-1996 Residential
slabs and footings-Construction” and relates to the estimation of Ys, “The characteristic surface
movement’ within reactive soil profiles. The limits used for this classification are as follows;

 

 

 

 

 

 

 

[Predicted Surface Movement _] Class |
Ys = <=20mm $s Slight
Ys = >20 - 40mm M Moderate
Ys = >40 ~ 70mm H High
Ys => 70mm E Extreme
Problem sites Pp Problem

 

 

 

 

Foundation Maintenance and Owners Responsibilities

Trees and dense shrubs must be kept well away from the building. In all types of soil conditions, if an
automatic watering system irrigates within 2.5 meters of a footing, instability problems may occur. Water
should not be allowed to pond on the ground near the building.

SCG CONSULTING ENGINEERS 5 SCG Ref: 17003(S)

Used in these records

About this file

File size
498 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2104 - Response to Information Request [As Published].pdf · 498 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.