Skip to the record
The only place to find full transcripts.

Council archive · source document

07/2104 - Response to Information Request [As Published] · 142007.2104

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Where site drainage and landscaping does not conform to the specifications of AS 2870-1996 and CSIRO
information Service Sheet BTF 18 (2003) significant damage to the building can be expected. A single
copy of this document is issued with the original issue of this report. Please consult your builder or
contact this office to obtain a copy.

6.0 FOOTING AND SLAB SPECIFICATIONS:

Footing Details:

All footings must be founded a minimum of 300mm into NATURAL MEDIUM DENSE SILTY SANDS _

. (shaded. on.the-attached log sections): Dimensions ‘and reinforcement fequiréménts are detailed in the

following footing plan and cross-sections.

Where the founding level is deep or is covered by the introduction of fill the footings are to be increased in
depth to reach the level. Alternatively the footings can be supported on backhoe dug or drilled piers
founded at or below the founding level. Refer to this office for details.

Where unexcavatable rock is encountered at depths shallower than the founding level, the strip footing
(non-retaining) depth may be reduced accordingly to a minimum of 150mm providing the footing is
founded a minimum of 100mm into un-weathered or un-disturbed rock. Additional reinforcement shall be
provided in the footing at the rock/soil interface, refer to attached details.

Backhoe Piers Supporting the Footings:

Where the NATURAL MEDIUM DENSE SILTY SANDS is deep or to be covered by fill the footings can
be supported on backhoe piers founded at a minimum of 300mm into the NATURAL MEDIUM DENSE
SILTY SANDS. These backhoe piers must be full trench width, 1000mm long and be at a maximum
spacing of 3000mm center to center.

Drilled Piers Supporting the Footings:

Where the NATURAL MEDIUM DENSE SILTY SANDS is deep or to be covered by fill the footings can
be supported on 350mm diameter drilled piers founded at a minimum of 300mm into the NATURAL
MEDIUM DENSE SILTY SANDS. ,

Where drilling piers is not practical the footings can be supported on backhoe piers (see cross-section ).

Where unexcavatable rock is encountered at depths shallower the founding level the piers shalt be
augered a minimum of 100mm into un-weathered or un-disturbed rock.

Drilled Pier Reinforcement:

 

 

 

 

 

 

[Pier Depthmm | Perimeter Piers | Slab Piers |
up to 1500 None required none required
1500-2500 2xN12bars none required
2500-4000 4xN142bars 2xN12bars
4000-6000 6xN12 bars 4xN12bars

 

 

 

 

 

Floor Slab Details:

We recommend reinforcing the floor slab as shown with SL82 slab fabric and the thickenings as
specified.

Where the foundation level of these thickenings is below prepared pad level, it may be advantageous to
excavate them at the same time as the perimeter footing.

Where the beams intersect the perimeter footing blockbase, their base must be graded down to the

footing base level, 3 x N12 bars must be cogged into the footing, and lapped 500 with the beams trench
mesh. Refer to the attached details.

SCG CONSULTING ENGINEERS 3 SCG Ref: 17003(S)

Used in these records

About this file

File size
498 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2104 - Response to Information Request [As Published].pdf · 498 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.