61. As Constructed drawings and data shall be certified by a qualified experienced Civil
Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
location, level and type of all services and structures. All of which shall be submitted to
Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to
drainage structures, finished ground levels and pavement surface levels. The data shall
be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines
on the use of ADAC are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been
supplied and accepted by Council.
HYDRAULICS & WATER QUALITY
Stormwater Drainage
62. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and designed in accordance with the requirements if the Queensland
Urban Drainage Manual, and must include in particular the provision of a relief overland
flowpath from the proposed sag point in the internal street drainage system. The
development layout is to be amended as necessary to achieve compliance with this
condition.
Stormwater Quality Management
63. A stormwater quality treatment system must be provided for the development which
achieves compliance with the Management Objectives specified in Section 4 of the
Girraween Stormwater Management Plan prepared by Ecological Engineering and dated
22/12/2006. The Stormwater Management Plan (SWMP) submitted with the application
is specifically not approved and a revised site SWMP consistent with the above is
required to be provided with the application for Operational Works. The revised site
SWMP is to specifically address the following:
63.1. Stormwater detention storage for downstream flood mitigation is not required
for this site and is to be deleted from the design. The stormwater devices are to
be raised in order to eliminate or reduce retaining structures and instead
provide batters to the biofiltration surface
63.2. Revised MUSIC modelling is to be provided demonstrating how the Girraween
Stormwater Management Plan pollutant load reduction targets and frequency of
discharge targets for surface flows to the national park will be achieved
63.3. Groundwater and in-situ infiltration testing is to be undertaken at the RL of the
proposed infiltration surface/interface for each proposed device and is to be
used to inform the design
63.4. Level spreaders must be provided at the interface between all discharge
locations and the adjoining National Park. The plans must be supported by
calculations demonstrating all proposed level spreaders are appropriately sized
to dissipate flows at non-erosive velocities for peak runoff events up to and
including the 1 in 100 year ARI event of critical duration. Level spreaders are to
be provided parallel to the downstream natural surface contours.
64. The works must be undertaken in accordance with an Operational Works approval and
the latest version of the Water Sensitive Urban Design Technical Design Guidelines for
South East Queensland, and must include in particular:
Page 10 of 21
Document Set ID: 20451866
Version: 1, Version Date: 14/11/2017 Print Date: 16 November 2017, 8:52 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Existing Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.