Council archive · source document
Attachment A - Existing Approval · 132008.1128.02
Attached to the e-mail Change to DA (Report, Existing Approval, Bushfire Technical Note, DA Form, Owners consent) - 132008.1128.02.
Noosa Council documents
132008.1128.01
64.1. Stormwater quality treatment devices of a size and location generally in
accordance with those documented in the revised site SWMP required by the
above condition; and
64.2. Bioretention devices which:
64.2.1. Are designed generally in accordance with IPWEQA Standard Drawing
No. WSUD-001
64.2.2. Incorporate a coarse sediment forebay (in addition to the required filter
media surface area), which is sized in accordance with the latest
version of the Water Sensitive Urban Design Technical Design
Guidelines for South East Queensland and designed generally in
accordance with IPWEQA Standard Drawing No. WSUD-005
64.2.3. Have safe, unobstructed and all weather access from the road frontage
for maintenance purposes, particularly for the coarse sediment forebay
64.2.4. Are provided with a high flow bypass to ensure that flows which
exceed the treatment capacity of the device are bypassed in order to
avoid damaging of the filter media or subjecting the filter media to
excessive sediment loads.
64.2.5. Are provided with a free-draining outlet from the sub-soil drainage
system
65. All stormwater quality treatment devices must be maintained in accordance with a
Maintenance Manual prepared for the development by a qualified person and submitted
to Council prior to the issue of any Development Permit for Operational Works. The
Maintenance Manual must include:
65.1. A plan showing the location of the individual components of the system
65.2. Manufacturer’s data and product information sheets for any proprietary
products
65.3. Location of inspection and monitoring points shown clearly on the plan
65.4. A schedule or timetable for the proposed regular inspection, maintenance and
monitoring of the devices.
Records of all maintenance activities undertaken must be kept and made available to
Council upon request.
66. Permanent educational signage must be erected to educate the residents of the
development about the function of the bioretention devices. The dimensions, standard,
presentation and location of the educational signage must be in accordance with an
Operational Works approval.
ENVIRONMENTAL HEALTH
Waste Management
67. The development must be provided with waste storage and disposal facilities in
accordance with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings
and Commercial and Industrial Premises”, including an external imperviously paved
area(s) correctly sized for the required number of refuse, recycling and commercial
waste containers and suitably screened from public places and neighbouring properties.
A bin wash area(s) is required with a cold-water tap, hose and drain outlet connected to
sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry
to the sewerage system and this can be achieved with a nib wall 50mm high and up to
700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed, or
any other design approved by Council’s Environment & Landscape Assessment Unit.
Page 11 of 21
Document Set ID: 20451866
Version: 1, Version Date: 14/11/2017 Print Date: 16 November 2017, 8:52 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Existing Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.