76. The level of the existing sewer access chambers within the development site must be
adjusted to suit the proposed finished surface levels. Work must be undertaken by
Unitywater at the applicants cost.
77. Stormwater retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
78. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and suitable
Unitywater approved varieties.
79. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
80. Prior to the issue of any Development Permit for Operational Works amended plans for
the development must be submitted to and approved by Council, the amended plans
must be consistent with the ‘Masterplan’ prepared by RPS dated 18 October 2017, Plan
Ref: 132938-01D.
DEVELOPMENT PERMIT CONDITIONS FOR RECONFIGURING A LOT (1 LOT INTO 2)
General
1. Development undertaken in accordance with this approval must generally comply with
the approved plans of development.
2. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Relevant Period
3. The relevant period is four (4) years from the day this permit takes effect and ends on 14
December 2015, during which time all conditions must have been complied with, and
the Plan of Survey lodged with Council for endorsement, unless an application to extend
the relevant period is approved by Council.
Nature Refuge Dedication
4. In accordance with former Noosa Shire Council resolution of its Ordinary Meeting of 29
March 2007, the balance undeveloped Open Space conservation portion of Lot 1
SP177650 must be gazetted a Nature Refuge under the Queensland Nature
Conservation Act. Evidence of the initiation of the gazettal process must be provided to
Council within 3 months of sealing of the plan of survey associated with this approval.
Water & Sewage
5. Reticulated water must be provided to each lot in the development (excluding balance
Lot 1). This must include:
5.1. Works in accordance with the approved findings of the water supply network
analysis by Worley Parsons, dated 30 July 2008.
5.2. Construction of a new 150mm diameter watermain to Unitywater standards
from the existing 200mm watermain in Ben Lexcen Drive to the existing 100mm
diameter watermain in the Culdesac of Grasstree Court.
5.3. A water service and approved water meter for each lot in accordance with
Unitywater Standard Drawings SCW 350,355 and 360.
5.4. Water meters located on alternative boundaries to electrical pillars.
Page 13 of 21
Document Set ID: 20451866
Version: 1, Version Date: 14/11/2017 Print Date: 16 November 2017, 8:52 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Existing Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.