68. The layout, design and construction of the development shall be such that the largest
design refuse collection vehicle (RCV) required to service the site, is afforded easy, safe
and unobstructed access and manoeuvring whilst collection occurs. In particular, the
route taken by the RCV must allow for entry and exiting of the site in a forward direction.
Internal trafficable roads shall be designed to accommodate the swept path of the largest
design RCV.
69. On refuse collection day, the site management entity shall be responsible for the
placement of refuse bins at a location which affords easy, safe and unobstructed access
for the cleansing contractor.
70. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”,
shall be developed and implemented on site, the contents of which shall be endorsed by
Council’s Environment & Landscape Assessment Unit prior to or at the time an
application is made for operational works. The Waste Management Plan must include
the following as a minimum: -
70.1. The types and estimated volumes of waste that will be generated from the
activities approved within the development.
70.2. Methods to be used for dealing with garden waste.
70.3. Initiatives to minimize waste either by waste prevention, reduction, re-use or
recycling.
70.4. Description of procedures and clearly identified site responsibilities for all site
occupants for getting all waste to the bins; the storage of bins and the collection
of bins by the contractor.
70.5. A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing and
system to prevent storm water getting into sewer via the bin wash.
70.6. A description of types and volume of waste storage containers to be used, and
the collection frequency of containers,
70.7. The waste and recycling storage area shall include the provision of containers
for all waste and recycling materials including putrescible matter, non-recycling
waste, paper/ cardboard, glass, aluminium/steel cans, waste oil, styrofoam
boxes, etc, and bin washing facilities connected to sewer.
UNITYWATER
Water & Sewage
71. A single Unitywater installed primary water meter must be provided immediately inside
the property boundary of each Lot (excluding balance Lot 1). Additional water meters
must be installed for each title of a community title or sub-lease scheme. Meters must be
Unitywater approved, installed in accordance with Unitywater requirements and remain
accessible at all times for reading and maintenance purposes.
72. The fire-fighting demand on Unitywater’s water supply system from the development
must not exceed 15 litres per second.
73. Construction activities must not impede the access of Unitywater or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers)
74. A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
proposed building envelopes, buildings (including roof overhang) and other structures.
75. The proposed bio-retention basins must be located a minimum of 1.5 metres from
Unitywater sewerage infrastructure and clear of any sewer easement.
Page 12 of 21
Document Set ID: 20451866
Version: 1, Version Date: 14/11/2017 Print Date: 16 November 2017, 8:52 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment A - Existing Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.