               68.    The layout, design and construction of the development shall be such that the largest
                      design refuse collection vehicle (RCV) required to service the site, is afforded easy, safe
                      and unobstructed access and manoeuvring whilst collection occurs. In particular, the
                      route taken by the RCV must allow for entry and exiting of the site in a forward direction.
                      Internal trafficable roads shall be designed to accommodate the swept path of the largest
                      design RCV.
               69.    On refuse collection day, the site management entity shall be responsible for the
                      placement of refuse bins at a location which affords easy, safe and unobstructed access
                      for the cleansing contractor.
               70.    A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
                      No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”,
                      shall be developed and implemented on site, the contents of which shall be endorsed by
                      Council’s Environment & Landscape Assessment Unit prior to or at the time an
                      application is made for operational works. The Waste Management Plan must include
                      the following as a minimum: -
                      70.1.       The types and estimated volumes of waste that will be generated from the
                                  activities approved within the development.
                      70.2.       Methods to be used for dealing with garden waste.
                      70.3.       Initiatives to minimize waste either by waste prevention, reduction, re-use or
                                  recycling.
                      70.4.       Description of procedures and clearly identified site responsibilities for all site
                                  occupants for getting all waste to the bins; the storage of bins and the collection
                                  of bins by the contractor.
                      70.5.       A description of the design details of waste storage and recycling areas
                                  including size, location, elevation and floor plan, methods of bin washing and
                                  system to prevent storm water getting into sewer via the bin wash.
                      70.6.       A description of types and volume of waste storage containers to be used, and
                                  the collection frequency of containers,
                      70.7.       The waste and recycling storage area shall include the provision of containers
                                  for all waste and recycling materials including putrescible matter, non-recycling
                                  waste, paper/ cardboard, glass, aluminium/steel cans, waste oil, styrofoam
                                  boxes, etc, and bin washing facilities connected to sewer.
               UNITYWATER
               Water & Sewage
               71.    A single Unitywater installed primary water meter must be provided immediately inside
                      the property boundary of each Lot (excluding balance Lot 1). Additional water meters
                      must be installed for each title of a community title or sub-lease scheme. Meters must be
                      Unitywater approved, installed in accordance with Unitywater requirements and remain
                      accessible at all times for reading and maintenance purposes.
               72.    The fire-fighting demand on Unitywater’s water supply system from the development
                      must not exceed 15 litres per second.
               73.    Construction activities must not impede the access of Unitywater or Fire Brigade
                      personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers)
               74.    A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
                      proposed building envelopes, buildings (including roof overhang) and other structures.
               75.    The proposed bio-retention basins must be located a minimum of 1.5 metres from
                      Unitywater sewerage infrastructure and clear of any sewer easement.

                                                                                                     Page 12 of 21


Document Set ID: 20451866
Version: 1, Version Date: 14/11/2017                                                               Print Date: 16 November 2017, 8:52 AM

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment A - Existing Approval.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.